A three-stage supply chain scheduling problem based on the nursing assistants’ daily work in a hospital

In a hospital, the nursing assistants in wards are always responsible for delivering patients to do some medical examinations, and the nursing assistants in the medical departments need take these patients back to the corresponding wards after examinations. We transform this actual problem about nursing assistants’ daily work into a three-stage supply chain scheduling problem if patients are regarded as jobs, the ward as the customer, the nursing assistants as vehicles and the medical department as the processing machine in the factory. The capacity of each vehicle is limited because the nursing assistant only can deliver several patients once. And the transportation schedule back and forth between the customer and the factory are the same in view of the actual arrangement. In order to reduce the average consumption time of patients, the objective is to minimize the total flowtime, that is, the sum of arrival time of every completed job back to the customer. We show that the problem is NP-hard in the strong sense, and provide an approximation algorithm with the performance ratio of 2. Moreover, we study some polynomially solvable cases of the problem.

[1]  Shan Wang,et al.  Online scheduling for outpatient services with heterogeneous patients and physicians , 2019, J. Comb. Optim..

[2]  C. Snyder,et al.  Nurses and nursing assistants decision-making regarding use of safe patient handling and mobility technology: A qualitative study. , 2018, Applied nursing research : ANR.

[3]  Chris N. Potts,et al.  Supply chain scheduling: Batching and delivery , 2003, Oper. Res..

[4]  Lixia Chen,et al.  Health-promoting lifestyles and their related influences among nursing assistants in nursing homes in China. , 2018, Applied nursing research : ANR.

[5]  Hua Yu,et al.  Three-dimensional stable matching with hybrid preferences , 2019, J. Comb. Optim..

[6]  Xiwen Lu,et al.  Supply chain scheduling problem in the hospital with periodic working time on a single machine , 2015, J. Comb. Optim..

[7]  Wenhua Li,et al.  The medical laboratory scheduling for weighted flow-time , 2019, J. Comb. Optim..

[8]  Jing Fan,et al.  Study on specialist outpatient matching appointment and the balance matching model , 2019, J. Comb. Optim..

[9]  Guochun Tang,et al.  A two-stage approach for surgery scheduling , 2014, J. Comb. Optim..

[10]  Yuzhong Zhang,et al.  Two-stage medical supply chain scheduling with an assignable common due window and shelf life , 2019, J. Comb. Optim..

[11]  Zhi-Long Chen,et al.  Integrated Production and Outbound Distribution Scheduling: Review and Extensions , 2010, Oper. Res..

[12]  Chung-Lun Li,et al.  Machine scheduling with pickup and delivery , 2005 .

[13]  Gang Du,et al.  Real-time scheduling optimization considering the unexpected events in home health care , 2019, J. Comb. Optim..

[14]  T. C. Edwin Cheng,et al.  Production scheduling with supply and delivery considerations to minimize the makespan , 2009, Eur. J. Oper. Res..

[15]  Yadong Wang,et al.  Two-machine flowshop scheduling in a physical examination center , 2019, J. Comb. Optim..

[16]  Yanqin Bai,et al.  Three-sided stable matching problem with two of them as cooperative partners , 2019, J. Comb. Optim..