A study on the deployment of high-speed broadband networks in NUTS3 regions within the framework of digital agenda for Europe

Abstract This paper investigates the high-speed broadband situation in the EU and its prospects. It uses a deployment model to estimate the investment required to meet the Digital Agenda for Europe (DAE) broadband targets set by the European Commission in its Europe 2020 strategy at different stages: as of 2016, after expected operators’ deployment, after public subsidies and leveraged investment, and as expected in 2020. The model uses data at the NUTS3 level, which is the most granular level that has data available on the status of broadband deployment, to arrive at a coherent and comparable framework. From the different perspectives on the investment to meet DAE targets, the paper concludes on the need for an appropriate combination of incumbent and alternative operators investments, public subsidies and leveraged investments, and new investments, both public and private and non-existing as of 2016, examining their feasibility and the impact of different regulatory, technical, and policy strategies.

[1]  Bm Bert Sadowski,et al.  Unlocking the potential of Italian broadband: Case studies and policy lessons , 2013 .

[2]  Reginald S. Lee,et al.  Cross-Case Analysis , 2006 .

[3]  C. Cambini,et al.  Broadband investment and regulation: A literature review , 2009 .

[4]  Anders Henten,et al.  Public private partnerships as a tool for stimulating investments in broadband , 2010 .

[5]  D. Varoutas,et al.  NGA investments: A departure from the existing cost and demand structure assumptions , 2012 .

[6]  M. Ünver Is a fine-tuning approach sufficient for EU NGA policy? A global review around the long-lasting debate , 2015 .

[7]  Antolin Moral,et al.  LTE techno-economic assessment , 2015 .

[8]  Juan Rendon Schneir,et al.  A cost study of fixed broadband access networks for rural areas , 2016 .

[9]  Fotios C. Harmantzis,et al.  Valuing wireless data services solutions for corporate clients using real options , 2007, Int. J. Mob. Commun..

[10]  C. Feijóo Next-Generation Access Networks , 2019, Encyclopedia of Law and Economics.

[11]  J. Gómez-Barroso,et al.  Policy tools for public involvement in the deployment of next generation communications , 2009 .

[12]  H. Gruber,et al.  Broadband access in the EU , 2014 .

[13]  Pantelis Koutroumpis,et al.  Using a digitization index to measure the economic and social impact of digital agendas , 2014 .

[14]  Marlies Van der Wee,et al.  Identifying and quantifying the indirect benefits of broadband networks for e-government and e-business , 2015 .

[15]  José Luis Gómez-Barroso,et al.  How much energy will your NGN consume? A model for energy consumption in next generation access networks: The case of Spain , 2013 .

[16]  Bengt G. Mölleryd Development of High-speed Networks and the Role of Municipal Networks , 2015 .

[17]  E. Bohlin,et al.  Unbundling and infrastructure competition for broadband adoption , 2014 .

[18]  Anna D’Annunzio,et al.  Co-investment in ultra-fast broadband access networks , 2016 .

[19]  Anastasios A. Economides,et al.  A Compound Real Option and AHP Methodology for Evaluating ICT Business Alternatives , 2009, Telematics Informatics.

[20]  Timo Smura,et al.  A cost model for radio access data networks , 2015 .

[21]  R. Mansell New visions, old practices: Policy and regulation in the Internet era , 2011 .

[22]  Andrea Renda,et al.  Competition-regulation interface in telecommunications: What's left of the essential facility doctrine , 2010 .

[23]  Jens Zander,et al.  An economic cost model for network deployment and spectrum in wireless networks , 2013 .

[24]  Martin Cave,et al.  Is Symmetric Access Regulation a Policy Choice? Evidence from the Deployment of NGA in Europe , 2015 .

[25]  Chris Ryan,et al.  Cross-Case Analysis , 2012 .