The Pareto principle and a hazard model as tools for appropriate scheduled maintenance in a manufacturing firm
暂无分享,去创建一个
Modestus O. Okwu | Chinedum Ogonna Mgbemena | Johnson Adebayo Fadeyi | Kingsley C. Ezekiel | C. Mgbemena | M. Okwu | J. Fadeyi
[1] Ashok Sarkar,et al. Issues in Pareto analysis and their resolution , 2013 .
[2] Ibrahim Elbeltagi,et al. Pareto-principle application in non-IT supported CRM processes: A case study of a Dutch manufacturing SME , 2014, Bus. Process. Manag. J..
[3] Fred Spiring,et al. Introduction to Statistical Quality Control , 2007, Technometrics.
[4] Miroslav Prístavka,et al. Evaluating The Effectiveness Of Production Process Using Pareto Analysis , 2015 .
[5] Tao Xie,et al. Reliability Engineering , 2017, IEEE Softw..
[6] G. Karuppusami,et al. Pareto analysis of critical success factors of total quality management: A literature review and analysis , 2006 .
[7] H Benjamin Harvey,et al. The Pareto Principle , 1980 .
[8] Klaas B. Klaassen. System Reliability , 1989 .