Steps in Assessing a Timeline-Based Planner
暂无分享,去创建一个
[1] Enrico Tronci,et al. Flexible Timeline-Based Plan Verification , 2009, KI.
[2] Rob Sherwood,et al. ASPEN-Automated Planning and Scheduling for Space Mission Operation , 2000 .
[3] Nicola Muscettola,et al. Planning in Interplanetary Space: Theory and Practice , 2000, AIPS.
[4] Marta Cialdea Mayer,et al. Planning and execution with flexible timelines: a formal account , 2016, Acta Informatica.
[5] Joachim Hertzberg,et al. Online task merging with a hierarchical hybrid task planner for mobile service robots , 2015, 2015 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS).
[6] Roman Barták,et al. Planning and Acting with Temporal and Hierarchical Decomposition Models , 2014, 2014 IEEE 26th International Conference on Tools with Artificial Intelligence.
[7] Marta Cialdea Mayer,et al. Enriching a Temporal Planner with Resources and a Hierarchy-Based Heuristic , 2015, AI*IA.
[8] Amedeo Cesta,et al. Towards a planning-based framework for symbiotic human-robot collaboration , 2016, 2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA).
[9] Amedeo Cesta,et al. MrSPOCK—STEPS IN DEVELOPING AN END‐TO‐END SPACE APPLICATION , 2011, Comput. Intell..
[10] Amedeo Cesta,et al. Design and implementation of a distributed part-routing algorithm for reconfigurable transportation systems , 2016, Int. J. Comput. Integr. Manuf..
[11] Amedeo Cesta,et al. Unifying planning and scheduling as timelines in a component-based perspective , 2008 .
[12] Frederic Py,et al. A systematic agent framework for situated autonomous systems , 2010, AAMAS.
[13] Angelo Montanari,et al. Timelines Are Expressive Enough to Capture Action-Based Temporal Planning , 2016, 2016 23rd International Symposium on Temporal Representation and Reasoning (TIME).
[14] Amedeo Cesta,et al. Towards a cooperative knowledge-based control agent for a reconfigurable manufacturing plant , 2014, Proceedings of the 2014 IEEE Emerging Technology and Factory Automation (ETFA).
[15] Amedeo Cesta,et al. A Planning-Based Architecture for a Reconfigurable Manufacturing System , 2016, ICAPS.
[16] Nicola Muscettola,et al. Dynamic Control Of Plans With Temporal Uncertainty , 2001, IJCAI.
[17] Jeremy Frank,et al. Constraint-Based Attribute and Interval Planning , 2003, Constraints.
[18] Marco Roveri,et al. Timelines with Temporal Uncertainty , 2013, AAAI.
[19] Ari K. Jónsson,et al. Activity Planning for the Mars Exploration Rovers , 2005, ICAPS.
[20] Malik Ghallab,et al. Representation and Control in IxTeT, a Temporal Planner , 1994, AIPS.
[21] Nicola Muscettola,et al. HSTS: Integrating Planning and Scheduling , 1993 .
[22] Steve Chien,et al. Automated Planning and Scheduling for Space Mission Operations , 2005 .
[23] Enrico Tronci,et al. Analyzing Flexible Timeline-based Plans , 2010, ECAI.
[24] Marta Cialdea Mayer,et al. An Executable Semantics of Flexible Plans in Terms of Timed Game Automata , 2015, 2015 22nd International Symposium on Temporal Representation and Reasoning (TIME).
[25] Marta Cialdea Mayer,et al. A Formal Account of Planning with Flexible Timelines , 2014, 2014 21st International Symposium on Temporal Representation and Reasoning.