Jinping hydropower project: main technical issues on engineering geology and rock mechanics
暂无分享,去创建一个
Wang Jian | Wu shiyong | Shen Manbin | W. Jian | Wu Shiyong | Shen Manbin
[1] Faquan Wu,et al. Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station , 2004 .
[2] Xia-Ting Feng,et al. Rockburst characteristics and numerical simulation based on a new energy index: a case study of a tunnel at 2,500 m depth , 2010 .
[3] S. Qi,et al. Influence of deep seated discontinuities on the left slope of Jinping I Hydropower Station and its stability analysis , 2010 .
[4] Shengwen Qi,et al. Engineering geological problems related to high geo-stresses at the Jinping I Hydropower Station, Southwest China , 2010 .
[5] Runqiu Huang,et al. Deformation mechanism and stability evaluation for the left abutment slope of Jinping I hydropower station , 2010 .
[6] Faquan Wu,et al. Unloading deformation during layered excavation for the underground powerhouse of Jinping I Hydropower Station, southwest China , 2010 .