Seven wastes elimination targeted by lean manufacturing case study “gaza strip manufacturing firms’’
暂无分享,去创建一个
[1] Fawaz M. Abdullah,et al. LEAN MANUFACTURING TOOLS AND TECHNIQUES IN THE PROCESS INDUSTRY WITH A FOCUS ON STEEL , 2003 .
[2] Kazuhiro Yamashita. IMPLEMENTATION OF LEAN MANUFACTURING PROCESS TO XYZ COMPANY IN MINNEAPOLIS AREA , 2004 .
[3] Nick Rich,et al. The seven value stream mapping tools , 1997 .
[4] Mohammad Reza Enaghani,et al. The Relationship between Lean and TPM , 2009 .
[5] Ibrahim Rawabdeh,et al. A model for the assessment of waste in job shop environments , 2005 .
[6] Philip Stephen,et al. Application of DMAIC to integrate Lean Manufacturing and Six Sigma , 2004 .
[7] Fred E. Meyers. Motion and Time Study for Lean Manufacturing , 1998 .
[8] Jan Olhager,et al. Lean and agile manufacturing: external and internal drivers and performance outcomes , 2009 .
[9] Jochen Czabke. Lean thinking in the secondary woodproducts industry : challenges and benefits , 2007 .
[10] Nick Rich,et al. High quality and low cost: the lean service centre , 2009 .
[11] William McGrath,et al. Impact Analysis of Large-Scale Lean Manufacturing Initiatives Upon Manufacturing Process Innovation in Irish Companies , 2007 .
[12] Ullisses Shimizu,et al. Lean Production, Market Share and Value Creation in the Agricultural Machinery Sector in Brazil , 2009 .
[13] Fredrik Ohlsson,et al. Lean Manufacturing at Volvo Truck Production Australia , 2005 .