Scheduling coupled tasks
暂无分享,去创建一个
[1] Fred C. Schweppe,et al. Radar signal design subject to simultaneous peak and average power constraints , 1966, IEEE Trans. Inf. Theory.
[2] William L. Maxwell,et al. Theory of scheduling , 1967 .
[3] S. Horing,et al. Optimal allocation of tracking pulses for an array radar , 1970 .
[4] C. V. Ramamoorthy,et al. On the Flow-Shop Sequencing Problem with No Wait in Process † , 1972 .
[5] Richard M. Karp,et al. On the Computational Complexity of Combinatorial Problems , 1975, Networks.
[6] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..