Wind turbine productivity considering electrical subassembly reliability.
暂无分享,去创建一个
[1] Mariusz Jagiela,et al. The BDFM as a Generator in Wind Turbines , 2006, 2006 12th International Power Electronics and Motion Control Conference.
[2] Anastasios G. Bakirtzis,et al. A probabilistic method for the evaluation of the performance of wind-diesel energy systems , 1992 .
[3] R. Billinton,et al. Cost-effective wind energy utilization for reliable power supply , 2004, IEEE Transactions on Energy Conversion.
[4] Roy Billinton,et al. Incorporation of wind energy conversion systems in conventional generating capacity adequacy assessment , 1992 .
[5] R. Chedid,et al. Probabilistic performance assessment of wind energy conversion systems , 1999 .
[6] A. Mostafaeipour,et al. Harnessing wind energy at Manjil area located in north of Iran , 2008 .
[7] Ronald N. Allan,et al. Generation availability assessment of wind farms , 1996 .
[8] Anastasios G. Bakirtzis. A probabilistic method for the evaluation of the reliability of stand alone wind energy systems , 1992 .
[9] Peter Tavner,et al. Reliability analysis for wind turbines , 2007 .
[10] Hua Chen,et al. Assessment of risk-based capacity benefit factors associated with wind energy conversion systems , 1998 .
[11] Peter Tavner,et al. Review of condition monitoring of rotating electrical machines , 2008 .
[12] A. Petersson. Analysis, Modeling and Control of Doubly-Fed Induction Generators for Wind Turbines , 2005 .
[13] H. Polinder,et al. Comparison of direct-drive and geared generator concepts for wind turbines , 2005, IEEE International Conference on Electric Machines and Drives, 2005..
[14] Roy Billinton,et al. Reliability evaluation of engineering systems : concepts and techniques , 1992 .
[15] Peter Tavner,et al. Predicting the design life of high integrity rotating electrical machines , 1999, IEMDC 1999.
[16] C. O. Nwankpa,et al. Stochastic analysis and simulation of grid-connected wind energy conversion system , 2000 .