A general mathematical formulation is presented for scheduling of construction projects and applied to the problem of highway construction scheduling. Repetitive and nonrepetitive tasks, work continuity constraints, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modeled. An optimization formulation is presented for the construction project scheduling problem with the goal of minimizing the direct construction cost. The nonlinear optimization is then solved by the neural dynamics model developed recently by Adeli and Park. For any given construction duration, the model yields at the optimum construction schedule for minimum construction cost automatically. By varying the construction duration, one can solve the cost-duration trade-off problem and obtain the global optimum schedule and the corresponding minimum construction cost. The new construction scheduling model provides the capabilities of both the CPM and LSM approaches. In addition, it provides features desirable for repetitive projects such as highway construction and allows schedulers greater flexibility. It is particularly suitable for studying the effects of change order on the construction cost. This research provides the mathematical foundation for development of a new generation of more general, flexible, and accurate construction scheduling systems.
[1]
Rehab Reda,et al.
RPM: Repetitive Project Modeling
,
1990
.
[2]
V. K. Handa,et al.
Linear scheduling using optimal control theory
,
1986
.
[3]
A. G. Razaqpur,et al.
USE OF NEURAL NETWORKS IN BRIDGE MANAGEMENT SYSTEMS
,
1995
.
[4]
Alan D. Russell,et al.
New Generation of Planning Structures
,
1993
.
[5]
Hyo Seon Park,et al.
COUNTERPROPAGATION NEURAL NETWORKS IN STRUCTURAL ENGINEERING
,
1995
.
[6]
Hojjat Adeli,et al.
Optimization of space structures by neural dynamics
,
1995,
Neural Networks.
[7]
Abdullah M. Alsugair,et al.
An Artificial Neural Network Approach to Allocating Construction Resources
,
1994
.
[8]
Hojjat Adeli,et al.
Hybrid CPN–Neural Dynamics Model for Discrete Optimization of Steel Structures
,
1996
.
[9]
Alan D. Russell,et al.
Extensions to Linear Scheduling Optimization
,
1988
.
[10]
Chung-Wei Feng,et al.
Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method
,
1995
.
[11]
Shlomo Selinger.
Construction Planning for Linear Projects
,
1980
.
[12]
Hojjat Adeli,et al.
A neural dynamics model for structural optimization—Theory
,
1995
.