Push-out tests on demountable shear connectors of steel-concrete composite structures
暂无分享,去创建一个
[1] Abdolreza Ataei,et al. SUSTAINABLE COMPOSITE BEAMS AND JOINTS WITH DECONSTRUCTABLE BOLTED SHEAR CONNECTORS , 2014 .
[2] Mark A. Bradford,et al. Flexural performance of innovative sustainable composite steel-concrete beams , 2017 .
[4] W T Marshall,et al. AN EXPERIMENT STUDY OF THE USE OF HIGH-STRENGTH FRICTION GRIP BOLTS AS SHEAR CONNECTORS IN COMPOSITE BEAMS , 1971 .
[5] Xianghe Dai,et al. Effect of Concrete Strength and Stud Collar Size to Shear Capacity of Demountable Shear Connectors , 2015 .
[6] Scott Walbridge,et al. Behaviour of steel–precast composite girders with through-bolt shear connectors under static loading , 2014 .
[7] Shi-Ming Chen,et al. Push-out tests of demountable headed stud shear connectors in steel-UHPC composite structures , 2017 .
[8] Michael D. Engelhardt,et al. Strengthening Existing Non-Composite Steel Bridge Girders Using Post-Installed Shear Connectors , 2007 .
[9] A. Ashour,et al. Experimental study on demountable shear connectors in composite slabs with profiled decking , 2016 .
[10] Michael F. Ashby. Materials and Sustainable Development , 2015 .
[11] Julian M. Allwood,et al. Viability and performance of demountable composite connectors , 2014 .
[12] Brian Uy,et al. Behaviour and Design of Connections for Demountable Steel and Composite Structures , 2017 .
[13] Theodore L. Karavasilis,et al. 16.15: Experimental evaluation of a novel demountable shear connector for accelerated repair or replacement of precast steel‐concrete composite bridges , 2017 .
[14] Brian Uy,et al. Time-dependent behaviour of composite beams with blind bolts under sustained loads , 2015 .
[15] L. Dallam,et al. High Strength Bolt Shear Connectors -Pushout Tests , 1968 .
[16] D. Lam,et al. Demountable Shear Connectors for Sustainable Composite Construction * , 2013 .
[17] S.S.M. Lee M.A. Bradford. Sustainable composite beams with deconstructable bolted shear connectors , 2013 .
[18] C. G. Chiorean,et al. A computer method for design and M-N-Φ analysis of composite steel-concrete cross-sections , 2013 .
[19] Milan Veljkovic,et al. Bolted shear connectors vs. headed studs behaviour in push-out tests , 2013 .
[20] Michael D. Engelhardt,et al. Behavior of post-installed shear connectors under static and fatigue loading , 2010 .