A Ricardian Theory of Hydroelectric Power Development: Some Canadian Evidence
暂无分享,去创建一个
Once a hydroelectric power site is operational, its production is constrained both by the available hydraulic energy that drives the turbines and by the installed capacity that limits the pace at which hydraulic energy can be turned into electricity. Different costs are associated with these two constraints. Assuming generating equipment mix cost minimization, the optimal stacking order under the load duration curve is derived when production is stationary and when it is growing exponentially. The analysis throws some light on a fairly widespread feature of Canadian hydroelectric power development: limited hydro power. The history of hydro power site development in British Columbia, Manitoba, and Quebec displays features consistent with the analysis.
[1] Dennis Anderson. Models for determining least-cost investments in electricity supply , 1972 .
[2] The role of energy limited hydro equipment in an optimal plant mix , 1984 .
[3] Ralph Turvey,et al. Optimal Pricing and Investment in Electricity Supply , 1968 .
[4] Benjamin Avi-Itzhak,et al. Electric Energy Generation: Economics, Reliability, and Rates , 1981 .
[5] Interprétation économique du principe du maximum , 1968 .