Multi-layer performance assessment method for sintering production process control system
暂无分享,去创建一个
Min Wu | Wei Jiao | Xin Chen | Wei Hua Cao
[1] Renjie Song,et al. Fuzzy Synthetic Evaluation of Relay Protection based on Variable Weight Value , 2015, MUE 2015.
[2] Sirish L. Shah,et al. Issues in performance diagnostics of model-based controllers ☆ , 2002 .
[3] Guo Jin-yu,et al. Study and Applications of Analytic Hierarchy Process , 2008 .
[4] Sirish L. Shah,et al. Practical Issues in Multivariable Feedback Control Performance Assessment , 1997 .
[5] Sirish L. Shah,et al. Performance Evaluation of two Industrial MPC Controllers , 2003 .
[6] Sun Cai-xin. Condition Assessment Model for Power Transformer in Service Based on Fuzzy Synthetic Evaluation , 2008 .
[7] He Jing,et al. Intelligent temperature control of ignition furnace in sintering machine , 2004, IEEE Conference on Cybernetics and Intelligent Systems, 2004..
[8] Sun Xiao-fe. Study on Multi-index Synthetic Evaluation System for Smart Grid , 2011 .
[9] Jiandong Wang,et al. Performance assessment of static lead-lag feedforward controllers for disturbance rejection in PID control loops. , 2016, ISA transactions.
[10] Hawa Mohamed Ismael,et al. Multi-Criteria Evaluation of Port Competitiveness in West Africa Using Analytic Hierarchy Process (AHP) , 2015 .
[11] T. Harris. Assessment of Control Loop Performance , 1989 .
[13] Arpan Kumar Kar,et al. A hybrid group decision support system for supplier selection using analytic hierarchy process, fuzzy set theory and neural network , 2015, J. Comput. Sci..