Project-Based Market Competition and Policy Implications for Sustainable Developments in Building and Construction Sectors

Building and construction sectors are significant contributors to the global economy, but their energy consumption necessitates greater commitment to sustainable developments. There is therefore a growing demand for green innovation in the form of cleaner production and policies to meet the modern requirements of sustainability. However, the nature in which public work is undertaken is in an environment of project-based market competition, whereby contractors routinely bid for contracts under specific project awarding systems, and variations are accompanied with the unique scope of individual projects before the final goods or services are delivered. A comprehensive understanding of the characteristics and contractors’ behavior in systems could help to identify the leverage points of policies. This paper proposes a system dynamics model, with quantitative analysis and simulations, to demonstrate the problems of a system with different project awarding systems and ineffective market performance. The framework of market efficiency and performance measures has been proposed to evaluate the project-based competition mechanism. Managerial policy implications for market efficiency and sustainable developments can thus be systematically discussed and compared through iterative computer simulations and scenario analysis.

[1]  O. Williamson The economic institutions of capitalism , 1985 .

[2]  John Messner,et al.  Comparing procurement methods for design-build projects , 2006 .

[3]  Drury B. Crawley,et al.  Building environmental assessment methods: applications and development trends , 1999 .

[4]  Liyin Shen,et al.  Key Factors Considered in Compiling Tender Prices for China’s Public Works Projects , 2013 .

[5]  Simaan M. AbouRizk,et al.  Toward Environmentally Sustainable Construction Processes: The U.S. and Canada’s Perspective on Energy Consumption and GHG/CAP Emissions , 2010 .

[6]  Raymond J. Cole,et al.  Emerging trends in building environmental assessment methods , 1998 .

[7]  W. Dugger The Economic Institutions of Capitalism , 1987 .

[8]  M. Yan,et al.  A Multimethodology Contractor Assessment Model for Facilitating Green Innovation: The View of Energy and Environmental Protection , 2013, TheScientificWorldJournal.

[9]  J. Rooke,et al.  Planning for claims: an ethnography of industry culture , 2004 .

[10]  Jonathan Haskel,et al.  Restructuring and Productivity Growth in UK Manufacturing , 2003 .

[11]  William E. Rees,et al.  The built environment and the ecosphere: a global perspective , 1999 .

[12]  Murat Gunduz,et al.  Damage to Treasury: Abnormally Low Tenders in Public Construction Works , 2009 .

[13]  K. Mohamed,et al.  Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery , 2011 .

[14]  W. Art Chaovalitwongse,et al.  Data Mining Framework to Optimize the Bid Selection Policy for Competitively Bid Highway Construction Projects , 2012 .

[15]  A. Kolk,et al.  Stakeholder Mismanagement and Corporate Social Responsibility Crises , 2006 .

[16]  Ron Pernick,et al.  The Clean Tech Revolution: The Next Big Growth and Investment Opportunity , 2007 .

[17]  R. Blundell,et al.  Market share, market value and innovation in a panel of British manufacturing firms , 1999 .

[18]  Li Liu,et al.  Analysis of market efficiency for the Shanghai stock market over time , 2010 .

[19]  Jesus M. de la Garza,et al.  Using Simulation to Understand the Impact of Deferred Maintenance , 2002 .

[20]  Antonio Minniti,et al.  Product market competition, R&D composition and growth , 2010 .

[21]  Ivan Damnjanovic,et al.  Best-Value Bid Selection Methods for Performance-Based Roadway Maintenance Contracts , 2012 .

[22]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[23]  David Arditi,et al.  Assessing contractor quality performance , 2002 .

[24]  Luca Vogt Economic Theory And The Construction Industry , 2016 .

[25]  E. Zavadskas,et al.  Multi‐objective contractor's ranking by applying the Moora method , 2008 .

[26]  Edmundas Kazimieras Zavadskas,et al.  Contractor selection of construction in a competitive environment , 2008 .

[27]  C K Chau,et al.  Factors affecting the implementation of green specifications in construction. , 2010, Journal of environmental management.

[28]  Stuart Johnson Greener Buildings Environmental impact of property , 1993 .

[29]  Morteza Rahimiyan,et al.  Evaluating the efficiency of divestiture policy in promoting competitiveness using an analytical method and agent-based computational economics , 2010 .

[30]  T. Michael Toole,et al.  Uncertainty and home builders' adoption of technological innovations , 1998 .

[31]  Osvaldo Luiz Gonçalves Quelhas,et al.  Sustainability in the Brazilian Heavy Construction Industry: An Analysis of Organizational Practices , 2013 .

[32]  J. Perloff,et al.  Modern Industrial Organization , 1990 .

[33]  J Swanson,et al.  Business Dynamics—Systems Thinking and Modeling for a Complex World , 2002, J. Oper. Res. Soc..

[34]  A. Bucci,et al.  Horizontal Innovation-Based Growth and Product Market Competition , 2006 .

[35]  Jati K. Sengupta,et al.  Quality and efficiency , 2000 .

[36]  Wei Lo,et al.  Evaluating Qualification-Based Selection System: A Simulation Approach , 2009 .

[37]  Raymond J. Cole,et al.  Building environmental assessment methods: clarifying intentions , 1999 .

[38]  Bo Xia,et al.  Key attributes underpinning different markup decision between public and private projects : a China study , 2013 .

[39]  S. Nickell Competition and Corporate Performance , 1996, Journal of Political Economy.

[40]  Edmundas Kazimieras Zavadskas,et al.  Contractor selection for construction works by applying saw‐g and topsis grey techniques , 2010 .

[41]  Jörg Schimmelpfennig,et al.  Modern Industrial Organization , 2014 .

[42]  Chien-Liang Lin,et al.  Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market , 2007 .

[43]  Michael C. Loulakis,et al.  Design-Build: Planning Through Development , 2000 .

[44]  Zohar J. Herbsman,et al.  MULTIPARAMETER BIDDING SYSTEM - INNOVATION IN CONTRACT ADMINISTRATION , 1992 .

[45]  John Bowers,et al.  The role of system dynamics in project management , 1996 .

[46]  A. B. Ngowi,et al.  Creating competitive advantage by using environment-friendly building processes , 2001 .

[47]  Marina Fumo,et al.  National and International Standardization (International Organization for Standardization and European Committee for Standardization) Relevant for Sustainability in Construction , 2010 .

[48]  Graham J. Ive,et al.  The Economics of the Modern Construction Firm , 2000 .

[49]  Michele Moretto,et al.  Time overruns as opportunistic behavior in public procurement , 2012 .

[50]  R. Edward Minchin,et al.  Quality-Based Contractor Rating Model for Qualification and Bidding Purposes , 2005 .

[51]  Yuhua Qiao,et al.  THE USE OF QUALIFICATIONS-BASED SELECTION IN PUBLIC PROCUREMENT: A SURVEY RESEARCH , 2003 .

[52]  Grace K C Ding,et al.  Sustainable construction--the role of environmental assessment tools. , 2008, Journal of environmental management.

[53]  Robin Spence,et al.  Sustainable development and the construction industry , 1995 .

[54]  Hua Tang,et al.  Stability Analysis of Cooperation between Owners and Contractors in the Construction Market , 2010 .

[55]  Professor Edward Ochieng,et al.  Stakeholder Engagement: Achieving Sustainability in the Construction Sector , 2013 .