Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India

Risk identification and analysis for complex mega infrastructure projects has become an integral part of the present day project management process. This paper aims to develop an integrated Fuzzy E...

[1]  H. M. Al-Humaidi,et al.  Using Fuzzy Failure Mode Effect Analysis to Model Cave-In Accidents , 2012 .

[2]  Aminah Robinson Fayek,et al.  Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating , 2005 .

[3]  Aminah Robinson Fayek,et al.  Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined Failure Mode and Effect Analysis, Fault Trees, Event Trees, and Fuzzy Logic , 2012 .

[4]  Chee Peng Lim,et al.  Fuzzy FMEA with a guided rules reduction system for prioritization of failures , 2006 .

[5]  Roozbeh Kangari Risk Management Perceptions and Trends of U.S. Construction , 1995 .

[6]  Bon-Gang Hwang,et al.  An enterprise risk management knowledge-based decision support system for construction firms , 2016 .

[7]  Daniel Boissier,et al.  Performance Assessment Based on Evidence Theory and Fuzzy Logic: Application to Building and Dam Performance , 2014 .

[8]  Hariharan Subramanyan,et al.  Construction Project Risk Assessment: Development of Model Based on Investigation of Opinion of Construction Project Experts from India , 2012 .

[9]  Aminah Robinson Fayek,et al.  Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP , 2010 .

[10]  Yang Su,et al.  Applying Six Sigma to Quality Improvement in Construction , 2013 .

[11]  Keith R. Molenaar,et al.  Exploring critical delivery selection risk factors for transportation design and construction projects , 2014 .

[12]  Yao-Chen Kuo,et al.  Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects , 2013 .

[13]  Trika Pitana,et al.  Fuzzy FMEA model for risk evaluation of ship collisions in the Malacca Strait: based on AIS data , 2014, J. Simulation.

[14]  Mohammad hayati,et al.  Risk Assessment using Fuzzy FMEA (Case Study: Tehran Subway Tunneling Operations) , 2017 .

[15]  Kumar Neeraj Jha,et al.  Determining Success Factors for a Construction Organization: A Structural Equation Modeling Approach , 2018 .

[16]  Kumar Neeraj Jha,et al.  An Empirical Study on Performance Measurement Factors for Construction Organizations , 2018 .

[17]  Daniel Constantin Anghel,et al.  Fuzzy Failure Mode and Effect Analysis Application to Improve Laser Cutting Process , 2014 .

[18]  Shahryar Sorooshian,et al.  4P delays in project management , 2018 .

[19]  Patrick X.W. Zou,et al.  Understanding and Improving Your Risk Management Capability: Assessment Model for Construction Organizations , 2010 .

[20]  Peggy A. Johnson,et al.  Assessing Relative Risk for the Failure Modes of a Bridge Scour Countermeasure , 2016 .

[21]  David de la Fuente,et al.  A decision support system for applying failure mode and effects analysis , 2002 .

[22]  Ahmed Ebrahim Abu El-Maaty,et al.  Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach , 2017 .

[23]  Jung-Ho Yu,et al.  A conflict-risk assessment model for urban regeneration projects using Fuzzy-FMEA , 2012 .

[24]  Xianbo Zhao,et al.  Identifying micro variables contributing to political risks in international construction projects , 2018 .

[25]  Rapinder Sawhney,et al.  A modified FMEA approach to enhance reliability of lean systems , 2010 .

[26]  Jamal F. Al‐Bahar,et al.  Systematic Risk Management Approach for Construction Projects , 1990 .

[27]  Creed S. J. Eom,et al.  Risk Index Model for Minimizing Environmental Disputes in Construction , 2009 .

[28]  Hyo-Nam Cho,et al.  Risk Assessment Methodology for Underground Construction Projects , 2004 .