Generation maintenance scheduling considering transmission constraints
暂无分享,去创建一个
[1] H.H. Zurn,et al. Several objective criteria for optimal generator preventive maintenance scheduling , 1977, IEEE Transactions on Power Apparatus and Systems.
[2] H. M. Merrill,et al. Power plant maintenance scheduling: optimizing economics and reliability , 1991 .
[3] M. Morozowski,et al. Transmission constrained maintenance scheduling of generating units: a stochastic programming approach , 1995 .
[4] Jay Yellen,et al. A decomposition approach to unit maintenance scheduling , 1992 .
[5] S. M. Shahidehpour,et al. Integrated generation and transmission maintenance scheduling with network constraints , 1997 .
[6] J. F. Benders. Partitioning procedures for solving mixed-variables programming problems , 1962 .
[7] E. Handschin,et al. Integrated maintenance scheduling system for electrical energy systems , 1998 .
[8] J.F. Dopazo,et al. Optimal generator maintenance scheduling using integer programming , 1975, IEEE Transactions on Power Apparatus and Systems.
[9] Junichi Toyoda,et al. Optimal generating unit maintenance scheduling for multi-area system with network constraints , 1991 .