Stochastic Optimization of Wind Turbine Power Factor Using Stochastic Model of Wind Power
暂无分享,去创建一个
Birgitte Bak-Jensen | Pierluigi Siano | Zhe Chen | Peiyuan Chen | P. Siano | Zhe Chen | Peiyuan Chen | B. Bak‐Jensen
[1] R. Wets,et al. Stochastic programming , 1989 .
[2] T. Lai. Time series analysis univariate and multivariate methods , 1991 .
[3] G. Papaefthymiou,et al. Using Copulas for Modeling Stochastic Dependence in Power System Uncertainty Analysis , 2009, IEEE Transactions on Power Systems.
[4] R. Billinton,et al. Cost-effective wind energy utilization for reliable power supply , 2004, IEEE Transactions on Energy Conversion.
[5] Bikash C. Pal,et al. Intermittent wind generation in optimal power flow dispatching , 2009 .
[6] G. Desrochers,et al. A Monte-Carlo Simulation Method for the Economic Assessment of the Contribution of Wind Energy to Power Systems , 1986, IEEE Transactions on Energy Conversion.
[7] William W. S. Wei,et al. Time series analysis - univariate and multivariate methods , 1989 .
[8] G. Papaefthymiou,et al. MCMC for Wind Power Simulation , 2008, IEEE Transactions on Energy Conversion.
[9] R. Billinton,et al. Generating capacity adequacy associated with wind energy , 2004, IEEE Transactions on Energy Conversion.
[10] Frede Blaabjerg,et al. Advanced power converters for universal and flexible power management in future electricity network - Converter applications in future European electricity network. , 2007 .
[11] Hadi Saadat,et al. Power System Analysis , 1998 .
[12] Thomas Ackermann,et al. Wind Power in Power Systems , 2005 .
[13] Birgitte Bak-Jensen,et al. Model of a synthetic wind speed time series generator , 2008 .
[14] B. Norman,et al. A solution to the stochastic unit commitment problem using chance constrained programming , 2004, IEEE Transactions on Power Systems.
[15] Wei-Jen Lee,et al. Studies on stochastic unit commitment formulation with flexible generating units , 2010 .
[16] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[17] D. Das. A fuzzy multiobjective approach for network reconfiguration of distribution systems , 2006, IEEE Transactions on Power Delivery.
[18] Birgitte Bak-Jensen,et al. ARIMA-Based Time Series Model of Stochastic Wind Power Generation , 2010, IEEE Transactions on Power Systems.
[19] R. Billinton,et al. Reliability-Based Transmission Reinforcement Planning Associated With Large-Scale Wind Farms , 2007, IEEE Transactions on Power Systems.
[20] Other. Renewable energy: market and policy trends in IEA countries , 2004 .
[21] R. Billinton,et al. Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment , 2006, IEEE Transactions on Energy Conversion.
[22] Dorota Kurowicka,et al. Integration of stochastic generation in power systems , 2006 .
[23] R. Billinton,et al. Time-series models for reliability evaluation of power systems including wind energy , 1996 .
[24] Walter G. Scott,et al. Distributed Power Generation Planning and Evaluation , 2000 .
[25] Ronald N. Allan,et al. Generation availability assessment of wind farms , 1996 .
[26] B. Bak-Jensen,et al. Probabilistic load models for simulating the impact of load management , 2009, 2009 IEEE Power & Energy Society General Meeting.