Value Orientation in Process Management

There is no doubt that at least since the 1990s process orientation has evolved into one of the central paradigms of organizational design. Since then, all process management subtasks have matured. Process management decisions, however, lack economic foundation. They are usually based on qualitative or technical criteria or on plausibility considerations that do not necessarily comply with typical objectives in a market economy. Consequently, design alternatives are hardly comparable and an integrated valuation of a company’s assets is impossible. The status quo is astonishing for several reasons: First, process management decisions usually imply investment projects with different risk/return positions and capital tie-up. Second, the need for designing processes according to their contribution to corporate objectives has been explicated repeatedly. Third, the paradigm of value-based management is an accepted theoretical framework from economic research that enables to consistently valuate the risk/return effects of decisions across functional areas, hierarchy levels, and asset classes. This suggests the hypothesis that process management in general as well as the goal orientation of process management decisions in particular have evolved almost independently of value-based management. In the paper at hand, this hypothesis is confirmed based on a sample of process management publications. We therefore explicate the research gap as regards value orientation in process management. In order to bridge the gap between value-based management and process-oriented organizational design, we transfer economically well-founded objective functions to process management decisions.

[1]  Richard T. Watson,et al.  Analyzing the Past to Prepare for the Future: Writing a Literature Review , 2002, MIS Q..

[2]  Martin Gneiser,et al.  Value-Based CRM , 2010, Bus. Inf. Syst. Eng..

[3]  August-Wilhelm Scheer,et al.  Architektur integrierter Informationssysteme , 1991 .

[4]  R. Dorf,et al.  The Balanced Scorecard: Translating Strategy Into Action , 1997, Proceedings of the IEEE.

[5]  David L. Olson,et al.  An integrated method to evaluate business process alternatives , 2005, Bus. Process. Manag. J..

[6]  A. G. Coenenberg,et al.  Wertorientierte Unternehmensführung: vom Strategieentwurf zur Implementierung , 2007 .

[7]  Mayank Gupta,et al.  Structural metrics for goal based business process design and evaluation , 2005, Bus. Process. Manag. J..

[8]  Michael Rosemann,et al.  Prozessmanagement : ein Leitfaden zur prozessorientierten Organisationsgestaltung , 2005 .

[9]  F. Caeldries Reengineering the Corporation: A Manifesto for Business Revolution , 1994 .

[10]  P. Mertens,et al.  Moden und Trends in Wirtschaftsinformatik und Information Systems , 2009 .

[11]  Hans Ulrich Buhl,et al.  Warum Green IT nicht ausreicht – oder: Wo müssen wir heute anpacken, damit es uns übermorgen immer noch gut geht? , 2008, Wirtsch..

[12]  Hans Ulrich Buhl,et al.  Integrated Enterprise Balancing mit integrierten Ertrags- und Risikodatenbanken , 2005, Wirtschaftsinf..

[13]  Wolfgang Schultze,et al.  Wertorientierte Steuerung: Anforderungen, Konzepte, Anwendungsprobleme , 2003 .

[14]  Robert J. Kauffman,et al.  Systems Design, Process Performance and Economic Outcomes , 2006, Proceedings of the 39th Annual Hawaii International Conference on System Sciences (HICSS'06).

[15]  Erich Frese,et al.  Grundlagen der Organisation : Konzept, Prinzipien, Strukturen , 1993 .

[16]  Hubert Oesterle,et al.  Prozessbenchmarking - Ein methodischer Ansatz zur Prozessentwicklung mit Standarsoftware , 1999 .

[17]  Wilhelm Rieger,et al.  Einführung in die Privatwirtschaftslehre , 1928 .

[18]  A. Rappaport,et al.  Creating shareholder value : the new standard for business performance , 1986 .

[19]  Thomas H. Davenport,et al.  Process Innovation: Reengineering Work Through Information Technology , 1992 .

[20]  J. A. de Bruijn,et al.  Process management , 2002 .

[21]  Sonja Horn Performance Measurement — Controlling mit Kennzahlen , 2009 .

[22]  A. Scheer,et al.  Electronic Business Engineering , 1999 .

[23]  Jochen Drukarczyk Wertorientierte Unternehmenssteuerung , 1997 .

[24]  Günter Bamberg,et al.  Unternehmensbewertung unter Unsicherheit: Zur entscheidungstheoretischen Fundierung der Risikoanalyse , 2006 .

[25]  Donald R. Strand,et al.  The business of engineering , 2005 .

[26]  Martin Reckenfelderbäumer,et al.  Entwicklungsstand und Perspektiven der Prozeßkostenrechnung , 1998 .

[27]  Rajkumar Roy,et al.  Operational risk analysis in business processes , 2007 .

[28]  Gabler Verlag,et al.  The Interaction of the Triad of Marketing, Financial Management, and IT , 2010 .

[29]  Kevin W. Linderman,et al.  An integrated systems approach to process control and maintenance , 2005, Eur. J. Oper. Res..

[30]  Thomas Gutzwiller,et al.  Business Engineering Prozeß- und Systementwicklung , 1995 .

[31]  P. Harmon The State of Business Process Management , 2013 .

[32]  Beatrice Gralton,et al.  Washington DC - USA , 2008 .

[33]  Jan vom Brocke,et al.  Wertorientiertes Prozessmanagement: State-of-the-Art und zukünftiger Forschungsbedarf , 2009, Wirtschaftsinformatik.

[34]  J. Brocke,et al.  Handbook on Business Process Management 1 , 2010 .

[35]  Peter Mertens,et al.  Erratum zu: Moden und Trends in Wirtschaftsinformatik und Information Systems – Eine vergleichende Literaturanalyse , 2009, Wirtschaftsinf..

[36]  Gottfried Vossen,et al.  Geschäftsprozeßmodellierung und Workflow-Management: Eine Einführung , 1996 .

[37]  George J. Klir,et al.  Uncertainty-Based Information , 1999 .

[38]  Jan vom Brocke,et al.  A value-driven approach to the design of service-oriented information systems—making use of conceptual models , 2010, Inf. Syst. E Bus. Manag..

[39]  Rajkumar Roy,et al.  Optimisation of business process designs: An algorithmic approach with multiple objectives , 2007 .

[40]  Ramayya Krishnan,et al.  A Risk Management Approach to Business Process Design , 2007, ICIS.

[41]  Erich Kosiol,et al.  Organisation der Unternehmung , 1962 .

[42]  Fritz Nordsieck,et al.  Betriebsorganisation : Betriebsaufbau und Betriebsablauf , 1961 .

[43]  Colette Rolland,et al.  A strategy driven business process modelling approach , 2005, Bus. Process. Manag. J..

[44]  Peter Albrecht,et al.  Methoden der risikobasierten Kapitalallokation im Versicherungs- und Finanzwesen , 2004 .

[45]  G. Klir,et al.  Uncertainty-based information: Elements of generalized information theory (studies in fuzziness and soft computing). , 1998 .

[46]  Yair Wand,et al.  Goal-Driven Multi-Process Analysis , 2007, J. Assoc. Inf. Syst..

[47]  Björn Häckel Sicherheitsäquivalente zur risikoadjustierten Bewertung: Unternehmensexterne Bewertungssicht vs. unternehmensinterne Steuerungssicht Replik zu den Anmerkungen „Zum Verhältnis von Wertadditivität bei Sicherheitsäquivalenten und Risikoanalyse“ von Reichling et al. (2008) , 2008 .

[48]  Yonghua Zhou,et al.  Project-oriented business process performance optimization , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).

[49]  Hubertus Wameling,et al.  Die Berücksichtigung von Steuern im Rahmen der Unternehmensbewertung , 2005 .

[50]  Michael Rosemann,et al.  Handbook on Business Process Management 1: Introduction, Methods, and Information Systems , 2010, BPM 2010.

[51]  Qiang Lu,et al.  Process development: a theoretical framework , 2006 .

[52]  Guido Schryen,et al.  Preserving Knowledge on IS Business Value , 2010, Bus. Inf. Syst. Eng..

[53]  Günter Bamberg,et al.  Zur Bewertung risikobehafteter Zahlungsströme mit intertemporaler Abhängigkeitsstruktur , 2004 .

[54]  Thomas Günther,et al.  Kostenrechnung und Kostenanalyse , 2011 .

[55]  Jan Mendling,et al.  Value-oriented process modeling: integrating financial perspectives into business process re-design , 2010, Bus. Process. Manag. J..

[56]  Elmar J. Sinz,et al.  Der Ansatz des Semantischen Objektmodells (SOM) zur Modellierung von Geschäftsprozessen , 1995, Wirtschaftsinf..

[57]  Donald H. Drury,et al.  A Historiographical Examination of Information Systems , 1999, Commun. Assoc. Inf. Syst..

[58]  Dina Neiger,et al.  Goal-Oriented Business Process Modeling with EPCs and Value-Focused Thinking , 2004, Business Process Management.

[59]  Peter Mertens,et al.  Moden und Trends in Wirtschafts- informatik und Information Systems :Eine vergleichende Literaturanalyse , 2009 .

[60]  Michael Rosemann,et al.  Introduction, methods and information systems , 2010 .

[61]  Björn Niehaves,et al.  Maturity Models in IS Research , 2010, ECIS.

[62]  Manfred Steiner,et al.  Finanzwirtschaft der Unternehmung , 2012 .

[63]  D. Kidd,et al.  Shareholder Theory—How Opponents and Proponents Both Get It Wrong , 2009 .

[64]  Björn Häckel,et al.  Risikoadjustierte Wertbeiträge zur ex ante Entscheidungsunterstützung: Ein axiomatischer Ansatz , 2010 .

[65]  Herman Aguinis Performance Management , 2005 .

[66]  Guido Schryen,et al.  Ökonomischer Wert von Informationssystemen - Beitrag von Literatur-Reviews zum Wissenserhalt ( = Preserving Knowledge on IS Business Value. What Literature Reviews Have Done) , 2010 .