Operational reliability evaluation of restructured power systems with wind power penetration utilizing reliability network equivalent and time-sequential simulation approaches

In the last two decades, the wind power generation has been rapidly and widely developed in many regions and countries for tackling the problems of environmental pollution and sustainability of energy supply. However, the high share of intermittent and fluctuating wind power production has also increased the burden of system operator for securing power system reliability during the operational phase. Moreover, the power system restructuring and deregulation have not only introduced the competition for reducing cost but also changed the strategy of reliability evaluation and management of power systems. The conventional long-term reliability evaluation techniques have been well developed, which have been more focused on planning and expansion rather than operation of power systems. This paper proposes a new technique for evaluating operational reliabilities of restructured power systems with high wind power penetration. The proposed technique is based on the combination of the reliability network equivalent and time-sequential simulation approaches. The operational reliability network equivalents are developed to represent reliability models of wind farms, conventional generation and reserve provides, fast reserve providers and transmission network in restructured power systems. A contingency management schema for real time operation considering its coupling with the day-ahead market is proposed. The time-sequential Monte Carlo simulation is used to model the chronological characteristics of corresponding reliability network equivalents. A simplified method is also developed in the simulation procedures for improving the computational efficiency. The proposed technique can be used to evaluate customers’ reliabilities considering high penetration of wind power during the power system operation in the deregulated environment.

[1]  Yi Ding,et al.  Long-Term Reserve Expansion of Power Systems With High Wind Power Penetration Using Universal Generating Function Methods , 2011, IEEE Transactions on Power Systems.

[2]  Yi Ding,et al.  Multi-state System Reliability Analysis and Optimization for Engineers and Industrial Managers , 2010 .

[3]  Yi Ding,et al.  Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques , 2007 .

[4]  M. Fotuhi-Firuzabad,et al.  A Reliability Model of Large Wind Farms for Power System Adequacy Studies , 2009, IEEE Transactions on Energy Conversion.

[5]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[6]  Roy Billinton,et al.  Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .

[7]  R. Billinton,et al.  A simplified wind power generation model for reliability evaluation , 2006, IEEE Transactions on Energy Conversion.

[8]  Daniel S. Kirschen,et al.  Optimising the spinning reserve requirements considering failures to synchronise , 2008 .

[9]  Anatoly Lisnianski,et al.  A multi-state Markov model for a short-term reliability analysis of a power generating unit , 2012, Reliab. Eng. Syst. Saf..

[10]  Yi Ding,et al.  Reliability and Price Risk Assessment of a Restructured Power System With Hybrid Market Structure , 2006, 2007 IEEE Power Engineering Society General Meeting.

[11]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .

[12]  Lalit Goel,et al.  Monte Carlo simulation based reliability evaluation in a multi-bilateral contracts market , 2004 .

[13]  Roy Billinton,et al.  Reliability evaluation of power systems , 1984 .

[14]  Yi Ding,et al.  Real-Time Market Concept Architecture for EcoGrid EU—A Prototype for European Smart Grids , 2013, IEEE Transactions on Smart Grid.

[15]  Yi Ding,et al.  Reliability assessment of restructured power systems using optimal load shedding technique , 2009 .

[16]  A. M. Leite da Silva,et al.  Frequency and duration calculations in composite generation and transmission reliability evaluation , 1992 .

[17]  Zhao Xu,et al.  Electric Vehicles in Power Systems with 50% Wind Power Penetration: The Danish Case and the EDISON programme , 2009 .

[18]  R. Billinton,et al.  Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment , 2006, IEEE Transactions on Energy Conversion.

[19]  Yi Ding,et al.  Redundancy analysis for repairable multi-state system by using combined stochastic processes methods and universal generating function technique , 2009, Reliab. Eng. Syst. Saf..

[20]  Roy Billinton,et al.  A system state transition sampling method for composite system reliability evaluation , 1993 .

[21]  Paul Giorsetto,et al.  Development of a New Procedure for Reliability Modeling of Wind Turbine Generators , 1983, IEEE Transactions on Power Apparatus and Systems.

[22]  Roy Billinton,et al.  Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply , 2001 .

[23]  R. Billinton,et al.  Cost-effective wind energy utilization for reliable power supply , 2004, IEEE Transactions on Energy Conversion.

[24]  Mahmud Fotuhi-Firuzabad,et al.  Integration of large-scale wind farm projects including system reliability analysis , 2011 .

[25]  D.M. Falcao,et al.  Probabilistic Wind Farms Generation Model for Reliability Studies Applied to Brazilian Sites , 2006, IEEE Transactions on Power Systems.

[26]  Roy Billinton,et al.  Reliability assessment of a restructured power system using reliability network equivalent techniques , 2003 .