Incorporating a cost lessening distribution policy into a production system with random scrap rate

This paper incorporates a cost lessening product distribution policy into a production system with random scrap rate, with the purpose of cutting down producer’s inventory holding cost. The present study reconsiders a production lot sizing problem examined by a prior paper and improves its replenishment lot size solution in terms of stock holding cost reduction. An n+1 product distribution policy is used here in lieu of the n multi-delivery plan adopted in prior study. Under the proposed policy, an initial installment of finished products is delivered to customer for satisfying the product demand during producer’s production uptime. Then, fixed quantity n installments of finished items are delivered to customer at a fixed interval of time at the end of uptime. Mathematical modeling is used and as a result, the optimal production lot size solution is derived. A numerical example with analysis is provided to show practical usage of research result and demonstrate its significant savings in holding costs.   Key words: Optimization, production system, replenishment lot size, multiple deliveries, scrap.

[1]  Steven Nahmias,et al.  Production and operations analysis , 1992 .

[2]  Soo Y. Chang,et al.  Optimal production run length and inspection schedules in a deteriorating production process , 2001 .

[3]  Yigal Gerchak,et al.  The Structure of Periodic Review Policies in the Presence of Random Yield , 1990, Oper. Res..

[4]  Leroy B. Schwarz,et al.  A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem , 1973 .

[5]  Yigal Gerchak,et al.  Multistage Production to Order with Rework Capability , 2002, Manag. Sci..

[6]  M. A. Wazed,et al.  Impacts of Common Processes in Multistage Production System under Machine Breakdown and Quality Uncertainties , 2010 .

[7]  Bhaba R. Sarker,et al.  Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries , 2006, Comput. Oper. Res..

[8]  Y. Chiu,et al.  Producer's replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time , 2010 .

[9]  M. Bayrak,et al.  Effects of power quality on manufacturing costs in textile industry , 2009 .

[10]  Singa Wang Chiu,et al.  Mathematical modeling for production system with backlogging and failure in repair , 2006 .

[11]  M. A. Wazed,et al.  Impacts of quality and processing time uncertainties in multistage production system , 2010 .

[12]  Yuan-Shyi Peter Chiu,et al.  Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..

[13]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[14]  Ruhul A. Sarker,et al.  An optimal batch size under a periodic delivery policy , 2001, Int. J. Syst. Sci..

[15]  Ki Ling Cheung,et al.  Joint determination of preventive maintenance and safety stocks in an unreliable production environment , 1997 .

[16]  Gyana R. Parija,et al.  An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .

[17]  Sarada Prasad Sarmah,et al.  Buyer vendor coordination models in supply chain management , 2006, Eur. J. Oper. Res..

[18]  Beatriz Abdul-Jalbar,et al.  Integer-ratio policies for distribution/inventory systems , 2005 .

[19]  Fassil Nebebe,et al.  Determination of economic production-shipment policy for a single-vendor-single-buyer system , 2000, Eur. J. Oper. Res..

[20]  Bhaba R. Sarker,et al.  Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers , 2009, Eur. J. Oper. Res..

[21]  Roger M. Hill Optimizing a Production System with a Fixed Delivery Schedule , 1996 .

[22]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[23]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[24]  Anton Abdulbasah Kamil,et al.  Analysis of inventory-production systems with Weibull distributed deterioration , 2009 .

[25]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[26]  Bhaba R. Sarker,et al.  An optimal batch size for a production system operating under a just-in-time delivery system , 1993 .

[27]  Singa Wang Chiu,et al.  Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .

[28]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[29]  Udo Buscher,et al.  Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..

[30]  Amir Hasanzadeh,et al.  A heuristic approach for designing a distribution network in a supply chainsystem , 2010 .

[31]  S. Viswanathan,et al.  Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..

[32]  L. B. Schwarz,et al.  Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System , 1985 .

[33]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .