Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework
暂无分享,去创建一个
[1] U. C. Gupta,et al. On the transient behaviour of a model for queues in series with finite capacity , 1983 .
[2] Anurag Kumar,et al. On the average idle time and average queue length estimates in an M/M/1 queue , 1992, Oper. Res. Lett..
[3] E. Muth. The production rate of a series of work stations with variable service times , 1973 .
[4] N. Prabhu. Transient Behaviour of a Tandem Queue , 1967 .
[5] Giri Kumar Tayi,et al. An integrated production-inventory model with reprocessing and inspection , 1988 .
[6] Hon-Shiang Lau,et al. The production rate of a two-stage system with stochastic processing times , 1986 .
[7] Tarun Gupta,et al. Looping in a multistage production system , 1984 .
[8] Alessandro Birolini,et al. On the Use of Stochastic Processes in Modeling Reliability Problems , 1985 .
[9] Marcel F. Neuts,et al. Matrix-geometric solutions in stochastic models - an algorithmic approach , 1982 .
[10] J. G. Jones. On the numerical solution of convolution integral equations and systems of such equations , 1961 .
[11] Nori Prakasa Rao,et al. On the mean production rate of a two-stage production system of the tandem type , 1975 .
[12] A. H. Christer. On the Use of Stochastic Processes in Modelling Reliability Problems , 1986 .
[13] Erhan Cinlar,et al. Markov Renewal Theory: A Survey , 1973 .
[14] B. Avi-Itzhak,et al. A Sequence of Two Servers with No Intermediate Queue , 1965 .