The use of Process Cost Model (PCM) for measuring quality costs of construction projects: model testing
暂无分享,去创建一个
[1] Sui Pheng Low,et al. A construction quality costs quantifying system for the building industry , 1998 .
[2] C. Tomkins,et al. Quality failure costs in civil engineering projects , 2000 .
[3] Raymond T. Aoieong,et al. A process approach in measuring quality costs of construction projects: model development , 2002 .
[4] W. B. Ledbetter,et al. MEASURING DESIGN AND CONSTRUCTION QUALITY COSTS , 1989 .
[5] H. Abdul-Rahman. The cost of non-conformance during a highway project: a case study , 1995 .
[6] Mark Hall,et al. A cost of quality analysis of a building project: towards a complete methodology for design and build , 2001 .
[7] C. W. Kam,et al. A survey of ISO 9001 implementation in engineering consultancies in Hong Kong , 1999 .
[8] Hamzah Abdul-Rahman. Capturing the Cost of Quality Failures in Civil Engineering , 1993 .
[9] C. W. Kam,et al. Development and implementation of quality assurance in public construction works in Singapore and Hong Kong , 1997 .
[10] Peter E.D. Love,et al. Quantifying the causes and costs of rework in construction , 2000 .
[11] C W Kam BSc MSc CEng Mhkie Mice,et al. ISO 9000 for Building and Civil Engineering Contractors , 1998 .