Simultaneous 2D hoist scheduling and production line design for multi-recipe and multi-stage material handling processes
暂无分享,去创建一个
[1] Yun Jiang,et al. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution , 2002 .
[2] Sujing Wang,et al. A new method of cyclic hoist scheduling for multi-recipe and multi-stage material handling processes , 2016, Comput. Chem. Eng..
[3] Qiang Xu,et al. Real‐time dynamic hoist scheduling for multistage material handling process under uncertainties , 2013 .
[4] Qiang Xu,et al. Simultaneous mixed-integer dynamic optimization for environmentally benign electroplating , 2011, Comput. Chem. Eng..
[5] Chengbin Chu,et al. A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line , 2005, Oper. Res. Lett..
[6] Chengbin Chu,et al. A polynomial algorithm for 2-degree cyclic robot scheduling , 2003, Eur. J. Oper. Res..
[7] Qiang Xu,et al. Production-ratio oriented optimization for multi-recipe material handling via simultaneous hoist scheduling and production line arrangement , 2013, Comput. Chem. Eng..
[8] Qiang Xu,et al. Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization , 2012 .
[9] Eugene Levner,et al. An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times , 2006, Oper. Res. Lett..
[10] Qiang Xu,et al. Graph-Assisted Cyclic Hoist Scheduling for Environmentally Benign Electroplating , 2004 .
[11] P.R. Kumar. Scheduling semiconductor manufacturing plants , 1994, IEEE Control Systems.
[12] Chengbin Chu,et al. Cyclic hoist scheduling based on graph theory , 1995, Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation. ETFA'95.
[13] J. Świątek,et al. Electroplating production scheduling by cyclogram unfolding in dynamic hoist scheduling problem , 2011 .
[14] Henry L. W. Nuttle,et al. Hoist Scheduling For A PCB Electroplating Facility , 1988 .
[15] Chengbin Chu,et al. Dynamic hoist scheduling problem with multi-capacity reentrant machines: A mixed integer programming approach , 2015, Comput. Ind. Eng..
[16] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[17] Kin Keung Lai,et al. A study of heuristics for bidirectional multi-hoist production scheduling systems , 1994 .
[18] Jacques Lamothe,et al. Hoist scheduling problem in a real time context , 1994 .
[19] W. C. Ng. Determining the optimal number of duplicated process tanks in a single-hoist circuit board production line , 1995 .
[20] Xiaoguang Yang,et al. Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach , 2004, Oper. Res..
[21] Ada Che,et al. Real‐time hoist scheduling for multistage material handling process under uncertainties , 2013 .
[22] Pierre Baptiste,et al. Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions , 1997 .
[23] Ronald D. Armstrong,et al. A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints , 1994 .
[24] A. Che,et al. Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach , 2004 .
[25] Joon-Mook Lim,et al. A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line , 1997 .