An exploratory study of protective inventory in a re-entrant line with protective capacity

While the effect of protective inventory on the performance of simple lines has received considerable attention, the same cannot be said for re-entrant lines. This paper attempts to meet that deficiency. This paper examines two different but related issues. First, the theory of constraints (TOC) evaporating cloud method is employed to show the traditional dilemma of increasing work-in-process (WIP) to fully utilise resources versus decreasing WIP inventory to reduce cycle time. The assumptions and implications of three different management philosophies (traditional, JIT/lean, and TOC) are explored in addressing this dilemma with respect to the use of both protective inventory and protective capacity. Second, given an unbalanced re-entrant line with fixed capacity, simulation is used to explore the effectiveness of using protective inventory by changing the level of WIP on two dependent variables: cycle time and throughput. Two sources of variation are simulated: processing time and breakdowns (machine failures). At a given WIP level, it was found that the amount of protective capacity at non-bottlenecks changed with increases in variability. Therefore the level of WIP inventory (with its protective inventory) and the level of protective capacity needed to protect against variability play a critical role in determining cycle time and throughput of the re-entrant line. While this is an exploratory study, comments on protective inventory and protective capacity are provided based on the three different management philosophies.

[1]  S. MacEachern The race is on. , 1983, Modern healthcare.

[2]  William L. Maxwell,et al.  The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..

[3]  Alan J. Mayne,et al.  Introduction to Simulation and SLAM , 1979 .

[4]  Stanley B. Gershwin,et al.  An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking , 1987, Oper. Res..

[5]  Barry Render,et al.  Operations Management , 2019, CCSP (ISC)2 Certified Cloud Security Professional Official Study Guide, 2nd Edition.

[6]  John B. Kidd,et al.  Toyota Production System , 1993 .

[7]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[8]  James F. Cox,et al.  Designing unbalanced lines - understanding protective capacity and protective inventory , 2002 .

[9]  B. Williams,et al.  Operations management. , 2001, Optometry.

[10]  A. Alan B. Pritsker,et al.  Introduction to simulation and SLAM II , 1979 .

[11]  Y. Sugimori,et al.  Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .

[12]  Roberto Cigolini,et al.  Designing unbalanced paced lines: a conceptual model and an experimental campaign , 2006 .

[13]  John H. Blackstone On the shape of protective capacity in a simple line , 2004 .

[14]  Lawrence D. Fredendall,et al.  Protective capacity positioning: Impact on manufacturing cell performance , 2001, Eur. J. Oper. Res..

[15]  John Davies,et al.  A case of personal productivity: Illustrating methodological developments in TOC , 2005 .

[16]  Pascal Dennis,et al.  Lean Production Simplified : A Plain-Language Guide to the World's Most Powerful Production System , 2002 .

[17]  Stanley B. Gershwin,et al.  Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers , 1983, Oper. Res..

[18]  Eliyahu M. Goldratt,et al.  What is this thing called theory of constraints and how should it be implemented , 1990 .

[19]  James F. Cox,et al.  An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios , 2003 .

[20]  M. Tao Zhang,et al.  Dynamic capacity modeling in semiconductor assembly manufacturing , 2008 .

[21]  James F. Cox,et al.  Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models , 2009 .

[22]  J. A. Buzacott,et al.  AUTOMATIC TRANSFER LINES WITH BUFFER STOCKS , 1967 .

[23]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[24]  J. Wijngaard The Effect of Interstage Buffer Storage on the Output of Two Unreliable Production Units in Series, with Different Production Rates , 1979 .

[25]  Gregory V. Frazier,et al.  Operations Management , 2001 .

[26]  Lisa J. Scheinkopf,et al.  Thinking for a Change: Putting the Toc Thinking Processes to Use , 1999 .

[27]  S. D. Deshmukh,et al.  Managing Business Process Flows: Principles of Operations Management , 2006 .

[28]  Carlos F. Bispo,et al.  Managing Simple re-entrant Flow Lines: Theoretical Foundation and Experimental Results , 2001 .

[29]  James F. Cox,et al.  Investigation of flow mechanisms in semiconductor wafer fabrication , 2003 .

[30]  Satya S. Chakravorty,et al.  Does Protective Capacity Assist Managers in Competing Along Time-Based Dimensions? , 1994 .