Water reservoirs and the risk of accidental flood occurrence. Case study: Stanca–Costesti reservoir and the historical floods of the Prut river in the period July–August 2008, Romania
暂无分享,去创建一个
Gheorghe Romanescu | Cristian Constantin Stoleriu | C. Stoleriu | G. Romanescu | A. Romanescu | Ana‐Maria Romanescu
[1] David Cameron. Flow, frequency, and uncertainty estimation for an extreme historical flood event in the Highlands of Scotland, UK , 2007 .
[2] A. Roy,et al. Comparison of impacts of dams on the annual maximum flow characteristics in three regulated hydrologic regimes in Québec (Canada) , 2006 .
[3] B. Kuhlmann,et al. Assessing flood risk for a rural detention area , 2008 .
[4] Anton Huber,et al. Runoff and peak flow responses to timber harvest and forest age in southern Chile , 2006 .
[5] Accuracy of Hydrodynamic Modeling of Flood Detention Reservoirs , 2007 .
[6] Gunnar Hoefer,et al. Flood magnification on the River Rhine , 2006 .
[7] W. Dorner,et al. Are floods in part a form of land use externality , 2008 .
[8] Estimation of ecological high flow , 2006 .
[9] Honggang Zhang,et al. A reservoir flood forecasting and control system for China / Un système chinois de prévision et de contrôle de crue en barrage , 2004 .
[10] Benjamin Dewals,et al. Micro-scale flood risk analysis based on detailed 2D hydraulic modelling and high resolution geographic data , 2010 .
[11] Hitoshi Tanaka,et al. Developing a hybrid multi‐model for peak flood forecasting , 2009 .
[12] Mahendra Singh Nathawat,et al. Waterlogging and flood hazards vulnerability and risk assessment in Indo Gangetic plain , 2010 .
[13] M. Godlewska,et al. Effects of flood on the functioning of the Dobczyce reservoir ecosystem , 2003, Hydrobiologia.
[14] Günter Blöschl,et al. Ensemble prediction of floods – catchment non-linearity and forecast probabilities , 2007 .
[15] Vijay P. Singh,et al. Complementary aspects of linear flood routing modelling and flood frequency analysis , 2006 .