Operating reserve assessment in interconnected generating systems
暂无分享,去创建一个
It is shown that the two risks concept can be used to determine the spinning reserve requirements of a multiarea interconnected system configuration. This is a probabilistic technique which takes into account the system parameters which directly or indirectly influence the system reliability. It is concluded that the use of a single system risk and an interconnected system risk provide valuable insight into the benefits of interconnection. These concepts are illustrated by application to two radially interconnected power systems. >
[1] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[2] Nathan Cohn,et al. Methods of controlling generation on interconnected power systems , 1961, Electrical Engineering.
[3] Roy Billinton,et al. The Effect of Rapid Start and Hot Reserve Units In Spinning Reserve Studies , 1972 .
[4] W. Grady,et al. A Practical Approach to Unit Commitment, Economic Dispatch and Savings Allocation for Multiple-Area Pool Operation with Import/Export Constraints , 1980, IEEE Transactions on Power Apparatus and Systems.