AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS
暂无分享,去创建一个
Eric Costa | Rui M. Sousa | Sara Bragança | Anabela Carvalho Alves | S. Bragança | Eric Costa | A. Alves | R. Sousa
[1] Daniel Roos,et al. The machine that changed the world : the story of lean production , 1991 .
[2] Rui M. Sousa,et al. Towards Eco-efficient Lean Production Systems , 2010, BASYS.
[3] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[4] 新郷 重夫,et al. A revolution in manufacturing : the SMED system , 1985 .
[5] Hendrik Van Landeghem,et al. Rules for integrating fast changeover capabilities into new equipment design , 2002 .
[6] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[7] Steve J. Culley,et al. Changeover Improvement: Reinterpreting Shingo's “SMED” Methodology , 2007, IEEE Transactions on Engineering Management.
[8] R. M. Sousa,et al. An industrial application of resource constrained scheduling for quick changeover , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.
[9] Geraint W Owen,et al. An assessment of the role of design in the improvement of changeover performance , 1996 .
[10] Geraint W Owen,et al. A critical evaluation of Shingo's 'SMED' (Single Minute Exchange of Die) methodology , 2000 .
[11] Yasuhiro Monden,et al. Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .