Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques
暂无分享,去创建一个
Yi Ding | Roy Billinton | Rajesh Karki | Peng Wang | Lalit Goel | R. Billinton | R. Karki | L. Goel | Peng Wang | Yi Ding
[1] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[2] A. M. Leite da Silva,et al. Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation , 1994 .
[3] L. Salvaderi,et al. Monte Carlo approach in planning studies: an application to IEEE RTS , 1988 .
[4] Roy Billinton,et al. Time sequential distribution system reliability worth analysis considering time varying load and cost models , 1999 .
[5] R. Billinton,et al. Reliability assessment of a restructured power system considering the reserve agreements , 2004, IEEE Transactions on Power Systems.
[6] Roy Billinton,et al. Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .
[7] Roy Billinton,et al. A system state transition sampling method for composite system reliability evaluation , 1993 .
[8] R. Billinton,et al. Unreliability Cost Assessment of an Electric Power System Using Reliability Network Equivalent Approaches , 2002, IEEE Power Engineering Review.
[9] Lalit Goel,et al. Monte Carlo simulation based reliability evaluation in a multi-bilateral contracts market , 2004 .
[10] Roy Billinton,et al. Reliability Evaluation of Engineering Systems , 1983 .
[11] Ronald N. Allan,et al. Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1996-1999 , 1984 .
[12] Roy Billinton,et al. Reliability assessment of a restructured power system using reliability network equivalent techniques , 2003 .