HYPOTHESIS TESTING BETWEEN SUSTAINABILITY FACTORS AND CONSTRUCTION WASTE GENERATION
暂无分享,去创建一个
[1] Khairulzan Yahya,et al. Eco‐costing of construction waste , 2006 .
[2] Marko Sarstedt,et al. PLS-SEM: Indeed a Silver Bullet , 2011 .
[3] Aftab Hameed Memon,et al. Issues on construction waste: The need for sustainable waste management , 2012, 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER).
[4] George Ofori,et al. CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION , 2000 .
[5] Wynne W. Chin. The partial least squares approach for structural equation modeling. , 1998 .
[6] A F Urio. Solid waste management strategy in Botswana: The reduction of construction waste , 2006 .
[7] Vivian W. Y Tam,et al. An investigation of construction wastes: an empirical study in Shenzhen , 2008 .
[8] Jörg Henseler,et al. On the convergence of the partial least squares path modeling algorithm , 2010, Comput. Stat..
[9] Amnon Katz,et al. A novel methodology to estimate the evolution of construction waste in construction sites. , 2011, Waste management.
[10] Ismail Abdul Rahman,et al. CAUSATIVE FACTORS OF CONSTRUCTION WASTE GENERATION IN MALAYSIA , 2015 .
[11] Ismail Abdul Rahman,et al. Time and cost performance of costruction projects in southern and cenrtal regions of penisular Malaysia , 2012, 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER).
[12] Ismail Abdul Rahman,et al. Study of Site's Construction Waste in Batu Pahat, Johor☆ , 2013 .
[13] Ann T W Yu,et al. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong. , 2013, Waste management.
[14] T. Ramayah,et al. Network collaboration and performance in the tourism sector , 2011 .
[15] Akintola Akintoye,et al. A survey of current cost estimating practices in the UK , 2000 .
[16] Weisheng Lu,et al. A framework for understanding waste management studies in construction. , 2011, Waste management.
[17] Wenfeng Liu,et al. Research on Construction Waste Resourcelization Legislation , 2013, 2013 Fifth International Conference on Measuring Technology and Mechatronics Automation.
[18] Yunpeng Hu. Minimization management of construction waste , 2011 .
[19] A. Banerjee,et al. Hypothesis testing, type I and type II errors , 2009, Industrial psychiatry journal.
[20] Jack P. C. Kleijnen,et al. Validation of Trace-Driven Simulation Models: Bootstrap Tests , 2001, Manag. Sci..
[21] Marko Sarstedt,et al. Partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research , 2014 .
[22] Guiwen Liu,et al. Quantifying construction and demolition waste: an analytical review. , 2014, Waste management.
[23] C Llatas,et al. A model for quantifying construction waste in projects according to the European waste list. , 2011, Waste management.
[24] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[25] A. A. A. Azis,et al. Challenges faced by construction industry in accomplishing sustainablity goals , 2012, 2012 IEEE Symposium on Business, Engineering and Industrial Applications.
[26] Shlomo Hareli,et al. Evaluating the effect of vehicle impoundment policy on illegal construction and demolition waste dumping: Israel as a case study. , 2014, Waste management.
[27] Theo Haupt,et al. Variation orders on construction projects: value-adding or waste? , 2009 .
[28] E. Ziegel,et al. Bootstrapping: A Nonparametric Approach to Statistical Inference , 1993 .
[29] Asmawati Bt Che Hasan,et al. Estimation model of construction waste materials in Malaysia: Steel , 2013, 2013 IEEE Business Engineering and Industrial Applications Colloquium (BEIAC).
[30] O Ortiz,et al. Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain. , 2010, Waste management.
[31] Amm Liu,et al. Research Methods for Construction (3rd ed.) , 2008 .
[32] Nur Emma Mustaffa,et al. Clients, Consultants and Contractors' Perception of Critical Success Factors for Construction Projects in Malaysia , 2011 .
[33] The quantification of local construction waste for the current construction waste management practices: A case study in Klang Valley , 2013, 2013 IEEE Business Engineering and Industrial Applications Colloquium (BEIAC).
[34] Noor Zalina Mahmood. Approach in Construction Industry: A Case Study on Prefabrication Method As a Tool for Waste Minimisation. , 2008 .
[35] Leonhard E. Bernold,et al. Source evaluation of solid waste in building construction , 1994 .
[36] Shirong Li,et al. Talking about the Production and Disposing of Construction Waste from the View of Sustainable Development , 2011, 2011 Asia-Pacific Power and Energy Engineering Conference.
[37] Thurasamy Ramayah,et al. The role of motivators in improving knowledge-sharing among academics , 2014, Inf. Res..
[38] Liu Guiwe. Minimization Management of Construction and Demolition Waste under Systemic View , 2011 .
[39] Shabbir H Gheewala,et al. Estimation of construction waste generation and management in Thailand. , 2009, Waste management.
[40] Ismail Abdul Rahman,et al. Initial PLS Model of Construction Waste Factors , 2014 .