HEURISTIC PROCEDURES FOR GROUP SCHEDULING
暂无分享,去创建一个
[1] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[2] David G. Dannenbring,et al. An Evaluation of Flow Shop Sequencing Heuristics , 1977 .
[3] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[4] Katsundo Hitomi,et al. Optimal Two-Stage Production Scheduling with Setup Times Separated , 1979 .
[5] Dileep R. Sule,et al. Sequency on two and three machines with setup, processing and removal times separated , 1983 .
[6] A. S. Spachis,et al. Heuristics for flow-shop scheduling , 1980 .
[7] L. G. Mitten. Sequencing n Jobs on Two Machines with Arbitrary Time Lags , 1959 .
[8] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .