Study on gob-side entry retaining in fully-mechanized longwall with top-coal caving and its application

Abstract Based on the engineering background of gob-side entry retaining in fully-mechanized longwall with top coal caving (GER-FLTC) on N2105 working face of Yuwu coal mine, by adopting the methods of theoretical analysis and numerical calculation, the control techniques of surrounding rocks in GER-FLTC working face are studied in this paper. The two main difficulties of stability of surrounding rocks at gob-side retained entry in fully-mechanized longwall working face are the stability control of top coal and control of large deformation of GER-FLTC working face. Interaction mechanical model between roofing and roadside backfilling in GER-FLTC is established and the equations for the calculation of roof-cutting resistance of roadside backfilling are derived. Results of numerical calculation show that the damage zones of top coal can be categorized into the delaminating zone of top coal above the backfilling, tensile damage zone of top coal above the retained roadway and shear damage zone of the upper rib of the solid coal. Stability control of top coal is the critical part to success of GER-FLTC. With consideration of large deformation of surrounding rocks of gob-side retained entry in fully-mechanized longwall, the support technique of “roofing control and wall strengthening” is proposed where high strength and highly prestressed anchor rods and diagonal tensile anchor cables support are used for top coal, high strength and highly prestressed yielding anchor rod support is used for solid coal and roadside prestressed load-carrying backfilling is constructed by high-water material, in order to maintain the integrity of the top coal, transfer load, high resistance yielding load-carrying of solid coal, roof-cutting of roadside backfilling and support, and to achieve GER-FLTC. Results from this study are successfully applied in engineering practice.

[1]  Feng Guan-ming Surrounding Rock Movement Regularity and Deformation Feature around Gob-Side Entry Retaining in Top-Coal Caving Mining Face , 2004 .

[2]  Zhang Dong,et al.  Simulation on Roof Activities of Gob-Side Entry Retaining in Fully-Mechanized Top-Coal Caving Faces , 2001 .

[3]  Chen Yong,et al.  Support technology research and application inside roadway of gob-side entry retaining , 2012 .

[4]  Xie Wen-bing,et al.  The key problem study about gob-side entry retaining in top-coal caving mining face , 2004 .

[5]  Bai Jian-biao,et al.  Development of Support Technology Beside Roadway in Goaf-Side Entry Retaining for Next Sublevel , 2004 .

[6]  Zhang Dong-sheng,et al.  Industrial Test of Road-In Packing for Gob-Side Entry Retaining in Fully-Mechanized Coalface with Top-Coal Caving , 2004 .

[7]  Yu Yang Stability principle and control of surrounding rock in deep coal roadway with large section and thick top-coal , 2011 .

[8]  Hua Xinzhu,et al.  Development status and improved proposals on gob-side entry retaining support technology in China , 2006 .

[9]  Ma Li-qiang,et al.  THE TECHNIQUE OF GOB-SIDE ENTRY RETAINING WITH ENTRY-IN PACKING ON ITS ORIGINAL POSITION IN FULLY-MECHANIZED COALFACE WITH TOP-COAL CAVING , 2005 .

[10]  Fan Gangwei STUDY ON PACKING BODY SUPPORTING RESISTANCE OF ENTER-IN PACKING FOR IN-SITU GOB-SIDE ENTRY RETAINING IN FULLY-MECHANIZED TOP-COAL CAVING MINING FACE , 2007 .

[11]  Wang Meng Roof mechanics analysis and backfill technology for abandoned roadway , 2013 .