Control Policy for a Manufacturing System with Random Yield and Rework
暂无分享,去创建一个
[1] Susan L. Albin,et al. The Impact of Clustered Defect Distributions in IC Fabrication , 1989 .
[2] Ram Akella,et al. Part Dispatch in Random Yield Multistage Flexible Test Systems for Printed Circuit Boards , 1992, Oper. Res..
[3] M. Parlar,et al. Periodic Review Production Models With Variable Yield And Uncertain Demand , 1988 .
[4] L LeeHau,et al. Lot Sizing with Random Yields , 1995 .
[5] Christopher S. Tang. The impact of uncertainty on a production line , 1990 .
[6] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..
[7] Christopher S. Tang,et al. Linear Control of a Markov Production System , 1992, Oper. Res..
[8] Dimitri P. Bertsekas,et al. Dynamic Programming and Stochastic Control , 1977, IEEE Transactions on Systems, Man, and Cybernetics.
[9] E. Silver. Establishing The Order Quantity When The Amount Received Is Uncertain , 1976 .
[10] C. H. Stapper. The defect-sensitivity effect of memory chips , 1986 .
[11] Hau L. Lee,et al. Production Control in Multistage Systems with Variable Yield Losses , 1988, Oper. Res..
[12] H. M. Wagner,et al. Algorithms and Heuristics for Variable-Yield Lot-Sizing. , 1987 .
[13] D. Jacobson. A general result in stochastic optimal control of nonlinear discrete-time systems with quadratic performance criteria , 1974 .
[14] R. E. Levitan. The Optimum Reject Allowance Problem , 1960 .
[15] Kamran Moinzadeh,et al. A continuous‐review inventory model with constant resupply time and defective items , 1987 .
[16] D. Kleinman,et al. Optimal stationary control of linear systems with control-dependent noise , 1969 .