Demand during Lead Time for Normal Unit Demand and Erlang Lead Time
暂无分享,去创建一个
We obtain an expression for the probability density function of demand during lead time when the distributions of demand and lead time are, respectively, normal and Erlang. This probability density function is then used to derive expressions for the protection level and potential lost sales. This paper may be considered an extension and also a clarification of a paper by Burgin that appeared in 1972.
[1] David Burden,et al. Production-Inventory Systems: Planning and Control , 1979 .
[2] T. Burgin. Inventory Control with Normal Demand and Gamma Lead Times , 1972 .
[3] Chandrasekhar Das. Explicit formulas for the order size and reorder point in certain inventory problems , 1976 .
[4] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .