Fluidized-bed combustion 1000-hour test program. Volume IV. Engineering details and post-test inspections

Volume IV of the report on the 1000 hour programme consists of three appendices giving details of the enginmering/construction aspects of the plant and reports from Stal-Laval Turbin A.B. Appendix N has been entered individually. (LTN)