Effect of Time-Varying Factors on Optimal Combination of Quality Inspectors for Offline Inspection Station

With advanced manufacturing technology, organizations like to cut their operational cost and improve product quality, yet the importance of human labor is still alive in some manufacturing industries. The performance of human-based systems depends much on the skill of labor that varies person to person within available manpower. Much work has been done on human resource and management, however, allocation of manpower based on their skill yet not investigated. For this purpose, this study considered offline inspection system where inspection is performed by the human labor of varying skill levels. A multi-objective optimization model is proposed based on Time-Varying factors; inspection skill, operation time and learning behavior. Min-max goal programming technique was used to determine the efficient combination of inspectors of each skill level at different time intervals of a running order. The optimized results ensured the achievement of all objectives of inspection station: the cost associated with inspectors, outgoing quality and inspected quantity. The obtained results proved that inspection performance of inspectors improves significantly with learning and revision of allocation of inspectors with the proposed model ensure better utilization of available manpower, maintain good quality and reduce cost as well.

[1]  Carlos D. Paternina-Arboleda,et al.  Non-linear programming model for cost minimisation in a supply chain, including non-quality and inspection costs , 2012 .

[2]  Robert Pellerin,et al.  Joint production and quality control of unreliable batch manufacturing systems with rectifying inspection , 2014 .

[3]  Mohamad Y. Jaber,et al.  Learning Curves : Theory, Models, and Applications , 2011 .

[4]  Salih O. Duffuaa,et al.  A general repeat inspection plan for dependent multicharacteristic critical components , 2008, Eur. J. Oper. Res..

[5]  David Sarne,et al.  Sequencing counts: A combined approach for sequencing and selecting costly unreliable off-line inspections , 2012, Comput. Oper. Res..

[6]  Salih O. Duffuaa,et al.  A multi-objective optimization model for process targeting using sampling plans , 2013, Comput. Ind. Eng..

[7]  강창욱,et al.  A Study of Inventory Models for Imperfect Manufacturing setup Considering Work-in-Process Inventory , 2014 .

[8]  Israel Tirkel,et al.  The relationship between yield and flow time in a production system under inspection , 2012 .

[9]  Hong-Fwu Yu,et al.  A Joint Inspection Policy between CSP-1 and Precise Inspection for Non-repairable Products under Inspection Errors and Return Cost , 2011 .

[10]  T. P. Wright,et al.  Factors affecting the cost of airplanes , 1936 .

[11]  Vahid Sarhangian,et al.  Contribution of simulation to the optimization of inspection plans for multi-stage manufacturing systems , 2009, Comput. Ind. Eng..

[12]  Yale T. Herer,et al.  Off-line inspections under inspection errors , 2009 .

[13]  Andrew Kusiak,et al.  From data to big data in production research: the past and future trends , 2019, Int. J. Prod. Res..

[14]  Mohamad Y. Jaber,et al.  Production , Manufacturing and Logistics Learning curves for processes generating defects requiring reworks , 2004 .

[15]  Mohamad Y. Jaber,et al.  The effect of human factors on the performance of a two level supply chain , 2012 .

[16]  Chih-Hsiung Wang,et al.  AN OFFLINE INSPECTION AND DISPOSITION MODEL INCORPORATING DISCRETE WEIBULL DISTRIBUTION AND MANUFACTURING VARIATION , 2008 .

[17]  Chih-Hsiung Wang,et al.  Economic optimization for an off-line inspection, disposition and rework model , 2011, Comput. Ind. Eng..

[18]  Chao-Yu Chou,et al.  Design of a CSP-1 plan based on regret-balanced criterion , 2000 .

[19]  Tzvi Raz,et al.  Economic optimization of off-line inspection , 2000 .

[20]  Salih O. Duffuaa,et al.  A multi-objective mathematical optimization model for process targeting using 100% inspection policy , 2013 .

[21]  Salih O. Duffuaa,et al.  Process-targeting model for a product with two dependent quality characteristics using acceptance sampling plans , 2009 .

[22]  Biswajit Sarkar,et al.  Product inspection policy for an imperfect production system with inspection errors and warranty cost , 2016, Eur. J. Oper. Res..

[23]  Salih O. Duffuaa,et al.  Impact of inspection errors on the performance measures of a general repeat inspection plan , 2005 .

[24]  Tullio Tolio,et al.  PERFORMANCE EVALUATION OF PRODUCTION SYSTEMS MONITORED BY STATISTICAL PROCESS CONTROL AND OFF-LINE INSPECTIONS , 2006 .

[25]  Muhammad Babar Ramzan,et al.  Minimization of inspection cost by determining the optimal number of quality inspectors in the garment industry , 2016 .

[26]  Hong-Fwu Yu,et al.  A mixed inspection policy for CSP-1 and precise inspection under inspection errors and return cost , 2009, Comput. Ind. Eng..

[27]  Lisa M. Maillart,et al.  DEMONSTRATING DEMING'S kp RULE USING AN ECONOMIC MODEL OF THE CSP-1 , 2000 .

[28]  F. FRANCESCHINI,et al.  Asymptotic defectiveness of manufacturing plants: An estimate based on process learning curves , 2002 .

[29]  Chao-Yu Chou,et al.  Economic design of continuous sampling plan under linear inspection cost , 2002 .

[30]  Mehrdad Tamiz,et al.  Practical Goal Programming , 2010 .

[31]  Israel Tirkel,et al.  Modeling cost benefit analysis of inspection in a production line , 2014 .

[32]  Chih-Hsiung Wang Economic off-line quality control strategy with two types of inspection errors , 2007, Eur. J. Oper. Res..

[33]  Arkadiusz Gola,et al.  Application of Fuzzy Logic in Assigning Workers to Production Tasks , 2016, DCAI.

[34]  Moonhee Yang Minimization of Inspection Cost in an Inspection System Considering the Effect of Lot Formation on AOQ , 2010 .

[35]  Moustafa Elshafei,et al.  Repeat inspection planning using dynamic programming , 2006 .

[36]  Tzvi Raz,et al.  Economic optimization of off-line inspection in a process subject to failure and recovery , 2005 .

[37]  Christos Koulamas,et al.  Quality improvement through product redesign and the learning curve , 1992 .

[38]  Salih O. Duffuaa,et al.  Impact of inspection errors on the formulation of a multi-objective optimization process targeting model under inspection sampling plan , 2015, Comput. Ind. Eng..

[39]  Salih O. Duffuaa,et al.  A process targeting model for a product with two dependent quality characteristics using 100% inspection , 2009 .

[40]  강창욱,et al.  A Synchronized Job Assignment Model for Manual Assembly Lines Using Multi-Objective Simulation Integrated Hybrid Genetic Algorithm (MO-SHGA) , 2017 .

[41]  Salih O. Duffuaa,et al.  Process targeting with multi-class screening and measurement error , 2003 .

[42]  Yigal Gerchak,et al.  Manufacturing to Order with Random Yield and Costly Inspection , 2000, Oper. Res..

[43]  Mohamad Y. Jaber,et al.  Managing yield by lot splitting in a serial production line with learning, rework and scrap , 2010 .

[44]  K. Govindaraju,et al.  Design of generalized CSP-C continuous sampling plan , 2000 .

[45]  Biswajit Sarkar,et al.  Effect of inspection performance in smart manufacturing system based on human quality control system , 2018 .

[46]  Yale T. Herer,et al.  Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control , 2009, Eur. J. Oper. Res..

[47]  Mohamad Y. Jaber,et al.  Learning curves for imperfect production processes with reworks and process restoration interruptions , 2008, Eur. J. Oper. Res..

[48]  Maurice Bonney,et al.  An economic order quantity (EOQ) for items with imperfect quality and inspection errors , 2011 .

[49]  Moon Hee Yang,et al.  Minimisation of inspection and rework cost in a BLU factory considering imperfect inspection , 2014 .

[50]  Reza Tavakkoli-Moghaddam,et al.  Mathematical modelling of a robust inspection process plan: Taguchi and Monte Carlo methods , 2015 .

[51]  Shey-Huei Sheu,et al.  Economic optimization of off-line inspection with rework consideration , 2009, Eur. J. Oper. Res..

[52]  B. Purushothama A Practical Guide to Quality Management in Spinning , 2011 .

[53]  Tzvi Raz,et al.  Optimal Parallel Inspection for Finding the First Nonconforming Unit in a Batch--An Information Theoretic Approach , 2000 .

[54]  Chih-Hsiung Wang,et al.  Optimal lot size and offline inspection policy , 2009, Comput. Math. Appl..

[55]  Yael Perlman,et al.  Economic design of offline inspections for a batch production process , 2013 .

[56]  Nien-Chi Liu,et al.  The effects of quality management practices on employees' well-being , 2014 .

[57]  Muhammad Azam,et al.  Mixed Acceptance Sampling Plans for Product Inspection Using Process Capability Index , 2014 .

[58]  H. F. Dodge A Sampling Inspection Plan for Continuous Production , 1943, Journal of Fluids Engineering.

[59]  V. Ramesh Babu Industrial engineering in apparel production , 2011 .

[60]  Mohamad Y. Jaber,et al.  An integrated supply chain model with errors in quality inspection and learning in production , 2014 .

[61]  Shoshana Anily,et al.  An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand , 2006, Oper. Res..

[62]  Gerald L. Thompson,et al.  Optimal strategies for general price-quality decision models of new products with learning production costs , 1996 .

[63]  M. Jaber,et al.  Economic order quantity model for items with imperfect quality with learning in inspection , 2010 .

[64]  Anna Saniuk,et al.  Human Factor in Sustainable Manufacturing , 2015, HCI.