OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
暂无分享,去创建一个
[1] M Sheykh Sajadieh,et al. CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH , 2009 .
[2] B. L. Dos Santos,et al. Selecting information systems projects: problems, solutions and challenges , 1989 .
[3] Armin Scholl,et al. Managing and modelling general resource transfers in (multi-)project scheduling , 2010, OR Spectr..
[4] José Luis Duarte Ribeiro,et al. An economic–probabilistic model for project selection and prioritization , 2014 .
[5] Madjid Tavana,et al. Solving multi-period project selection problems with fuzzy goal programming based on TOPSIS and a fuzzy preference relation , 2013, Inf. Sci..
[6] Kaveh Khalili Damghani,et al. A decision support system for fuzzy multi-objective multi-period sustainable project selection , 2013, Comput. Ind. Eng..
[7] Pin-Yu Chu,et al. A fuzzy AHP application in government-sponsored R&D project selection☆ , 2008 .
[8] Mohammad Rostami,et al. Resource Pool Location for Periodic Services in Decentralized Multi-Project Scheduling Problems , 2017 .
[9] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[10] Madjid Tavana,et al. An integrated multi-objective framework for solving multi-period project selection problems , 2012, Appl. Math. Comput..
[11] Kent D. Messer,et al. Maximizing benefits in project selection: a hybrid approach , 2017 .
[12] Fang Fu. Integrated scheduling and batch ordering for construction project , 2014 .
[13] Seyed Hessameddin Zegordi,et al. Integrated resource management for simultaneous project selection and scheduling , 2017, Comput. Ind. Eng..
[14] Babak Abbasi,et al. Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies , 2017 .
[15] Liqun Liu. A marginal cost of funds approach to multi-period public project evaluation: implications for the social discount rate , 2003 .
[16] Madan Lal Mittal,et al. A multi-agent system for decentralized multi-project scheduling with resource transfers , 2013 .
[17] Jörg Homberger,et al. Decentralized Multi-Project Scheduling , 2015 .
[18] A. A. Elimam,et al. Integrated Project Scheduling and Material Planning with Variable Activity Duration and Rewards , 1996 .
[19] Adrien Presley,et al. R&D project selection using the analytic network process , 2002, IEEE Trans. Engineering Management.
[20] Mohammad Rostami,et al. A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems , 2020, Oper. Res..
[21] N. J. Aquilano,et al. A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning , 1980 .
[22] Andreas Drexl,et al. Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application , 1997 .
[23] Fereidoun Ghasemzadeh,et al. An integrated framework for project portfolio selection , 1999 .
[24] Armin Scholl,et al. A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times , 2009 .
[25] Kum Khiong Yang,et al. A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment , 1993 .