OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentralized and their distances are long, and second, there are several construction projects undertaken at different time periods. Therefore, appropriate selection of projects with regard to the capabilities of the organization may lead with increasing an expected profitability. This paper investigates the multi-period decentralized multi construction-project and scheduling problem subject to resource constraints, optimal resource pool location, deterioration and batch ordering of nonrenewable resources altogether, for the first time in the literature. In order to describe the problem under consideration in this paper and obtaining the optimal solutions, a mixed integer linear programming model is developed. Finally, the impact of decision integration on the profit profile of an organization is comprehensively investigated by solving numerical examples and through developing some heuristic methods.

[1]  M Sheykh Sajadieh,et al.  CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH , 2009 .

[2]  B. L. Dos Santos,et al.  Selecting information systems projects: problems, solutions and challenges , 1989 .

[3]  Armin Scholl,et al.  Managing and modelling general resource transfers in (multi-)project scheduling , 2010, OR Spectr..

[4]  José Luis Duarte Ribeiro,et al.  An economic–probabilistic model for project selection and prioritization , 2014 .

[5]  Madjid Tavana,et al.  Solving multi-period project selection problems with fuzzy goal programming based on TOPSIS and a fuzzy preference relation , 2013, Inf. Sci..

[6]  Kaveh Khalili Damghani,et al.  A decision support system for fuzzy multi-objective multi-period sustainable project selection , 2013, Comput. Ind. Eng..

[7]  Pin-Yu Chu,et al.  A fuzzy AHP application in government-sponsored R&D project selection☆ , 2008 .

[8]  Mohammad Rostami,et al.  Resource Pool Location for Periodic Services in Decentralized Multi-Project Scheduling Problems , 2017 .

[9]  Rainer Kolisch,et al.  PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .

[10]  Madjid Tavana,et al.  An integrated multi-objective framework for solving multi-period project selection problems , 2012, Appl. Math. Comput..

[11]  Kent D. Messer,et al.  Maximizing benefits in project selection: a hybrid approach , 2017 .

[12]  Fang Fu Integrated scheduling and batch ordering for construction project , 2014 .

[13]  Seyed Hessameddin Zegordi,et al.  Integrated resource management for simultaneous project selection and scheduling , 2017, Comput. Ind. Eng..

[14]  Babak Abbasi,et al.  Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies , 2017 .

[15]  Liqun Liu A marginal cost of funds approach to multi-period public project evaluation: implications for the social discount rate , 2003 .

[16]  Madan Lal Mittal,et al.  A multi-agent system for decentralized multi-project scheduling with resource transfers , 2013 .

[17]  Jörg Homberger,et al.  Decentralized Multi-Project Scheduling , 2015 .

[18]  A. A. Elimam,et al.  Integrated Project Scheduling and Material Planning with Variable Activity Duration and Rewards , 1996 .

[19]  Adrien Presley,et al.  R&D project selection using the analytic network process , 2002, IEEE Trans. Engineering Management.

[20]  Mohammad Rostami,et al.  A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems , 2020, Oper. Res..

[21]  N. J. Aquilano,et al.  A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning , 1980 .

[22]  Andreas Drexl,et al.  Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application , 1997 .

[23]  Fereidoun Ghasemzadeh,et al.  An integrated framework for project portfolio selection , 1999 .

[24]  Armin Scholl,et al.  A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times , 2009 .

[25]  Kum Khiong Yang,et al.  A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment , 1993 .