Bulk electric system reliability simulation and application

Bulk electric system reliability analysis is an important activity in both vertically integrated and unbundled electric power utilities. Competition and uncertainty in the new deregulated electric utility industry are serious concerns. New planning criteria with broader engineering consideration of transmission access and consistent risk assessment must be explicitly addressed. Modern developments in high speed computation facilities now permit the realistic utilization of sequential Monte Carlo simulation technique in practical bulk electric system reliability assessment resulting in a more complete understanding of bulk electric system risks and associated uncertainties. Two significant advantages when utilizing sequential simulation are the ability to obtain accurate frequency and duration indices, and the opportunity to synthesize reliability index probability distributions which describe the annual index variability. This research work introduces the concept of applying reliability index probability distributions to assess bulk electric system risk. Bulk electric system reliability performance index probability distributions are used as integral elements in a performance based regulation (PBR) mechanism. An appreciation of the annual variability of the reliability performance indices can assist power engineers and risk

[1]  Roy Billinton Composite System Reliability Evaluation , 1969 .

[2]  Roy Billinton,et al.  Utilization of interrupted energy assessment rates in generation and transmission system planning , 1991 .

[3]  D. W. Scott,et al.  Multivariate Density Estimation, Theory, Practice and Visualization , 1992 .

[4]  R. Billinton,et al.  Probabilistic assessment of power systems , 2000, Proceedings of the IEEE.

[5]  D.S. Kirschen,et al.  A probabilistic indicator of system stress , 2004, IEEE Transactions on Power Systems.

[6]  R. Billinton,et al.  Delivery point reliability indices of a bulk electric system using sequential Monte Carlo simulation , 2006, IEEE Transactions on Power Delivery.

[7]  A.A. Chowdhury,et al.  Reliability worth assessment in electric power delivery systems , 2004, IEEE Power Engineering Society General Meeting, 2004..

[8]  B. Stott,et al.  Review of load-flow calculation methods , 1974 .

[9]  A.M.L. da Silva,et al.  Well-being analysis for composite generation and transmission systems , 2004, IEEE Transactions on Power Systems.

[10]  Sudhir Kumar ADEQUACY EVALUATION OF COMPOSITE POWER SYSTEMS , 1984 .

[11]  Wenyuan Li,et al.  Risk Assessment Of Power Systems: Models, Methods, and Applications , 2004 .

[12]  G. W. Stagg,et al.  Computer methods in power system analysis , 1968 .

[13]  K. K. Kariuki,et al.  Evaluation of reliability worth and value of lost load , 1996 .

[14]  Roy Billinton,et al.  A system state transition sampling method for composite system reliability evaluation , 1993 .

[15]  Paul Giorsetto,et al.  Development of a New Procedure for Reliability Modeling of Wind Turbine Generators , 1983, IEEE Transactions on Power Apparatus and Systems.

[16]  R. Billinton,et al.  Low Bus Voltage and Ill-Conditioned Network Situations in a Composite System Adequacy Evaluation , 1987, IEEE Transactions on Power Systems.

[17]  Roy Billinton,et al.  BULK SYSTEM RELIABILITY - PREDICTIVE INDICES , 1990 .

[18]  Roy Billinton,et al.  Comprehensive bibliography on reliability worth and electrical service consumer interruption costs: 1980-90 , 1991 .

[19]  Boon-Teck Ooi,et al.  Assessment and control of the impact of FACTS devices on power system performance , 1996 .

[20]  R. Billinton,et al.  Time-series models for reliability evaluation of power systems including wind energy , 1996 .

[21]  Zhaoming Pan ELECTRIC DISTRIBUTION SYSTEM RISK ASSESSMENT USING RELIABILITY INDEX PROBABILITY DISTRIBUTIONS , 2003 .

[22]  Roy Billinton,et al.  A hybrid model for quantifying different operating states of composite power systems , 1992 .

[23]  Roy Billinton,et al.  Evaluation of reliability worth in an electric power system , 1994 .

[24]  David G. Luenberger,et al.  Linear and nonlinear programming , 1984 .

[25]  Michael Milligan,et al.  Modeling Utility-Scale Wind Power Plants Part 2: Capacity Credit , 2000 .

[26]  A. M. Leite da Silva,et al.  Frequency and duration calculations in composite generation and transmission reliability evaluation , 1992 .

[27]  Roy Billinton,et al.  Composite power system health analysis using a security constrained adequacy evaluation procedure , 1994 .

[28]  Annapoorani Jonnavithula Composite system reliability evaluation using sequential Monte Carlo simulation , 1997 .

[29]  J. Hammersley SIMULATION AND THE MONTE CARLO METHOD , 1982 .

[30]  R. L. Sullivan,et al.  Power system planning , 1977 .

[31]  Roy Billinton,et al.  Applied reliability assessment in electric power systems , 1991 .

[32]  Roy Billinton,et al.  Incorporating reliability index probability distributions in performance based regulation , 2002, IEEE CCECE2002. Canadian Conference on Electrical and Computer Engineering. Conference Proceedings (Cat. No.02CH37373).

[33]  Roy Billinton,et al.  Composite generation and transmission systems , 1984 .

[34]  N.D. Reppen,et al.  Increasing utilization of the transmission grid requires new reliability criteria and comprehensive reliability assessment , 2005, 2004 International Conference on Probabilistic Methods Applied to Power Systems.

[35]  Roy Billinton,et al.  Impact of Load Shedding Philosophies on Bulk Electric System Reliability Analysis Using Sequential Monte Carlo Simulation , 2006 .

[36]  R. Billinton,et al.  Quantitative reliability considerations in the determination of performance-based rates and customer service disruption payments , 2002 .

[37]  R. Billinton,et al.  Generating capacity adequacy associated with wind energy , 2004, IEEE Transactions on Energy Conversion.

[38]  N. J. Balu,et al.  Composite generation/transmission reliability evaluation , 1992, Proc. IEEE.

[39]  R. Billinton,et al.  Reliability-performance-index probability distribution analysis of bulk electricity systems , 2005, Canadian Journal of Electrical and Computer Engineering.

[40]  William D. Stevenson,et al.  Elements of Power System Analysis , 1962 .

[41]  Lennart Ljung,et al.  System identification toolbox for use with MATLAB , 1988 .

[42]  Wenyuan Li,et al.  Composite System Adequacy Assessment , 1994 .

[43]  C. M. Fallon,et al.  Value-based reliability transmission planning , 1996 .

[44]  Herbert A. Sturges,et al.  The Choice of a Class Interval , 1926 .

[45]  N. D. Reppen,et al.  Reporting bulk power system delivery point reliability , 1996 .

[46]  R. Billinton,et al.  Approximate methods for event-based customer interruption cost evaluation , 2005, IEEE Transactions on Power Systems.

[47]  M. Wand Data-Based Choice of Histogram Bin Width , 1997 .

[48]  A. Sankarakrishnan,et al.  Effective techniques for reliability worth assessment in composite power system networks using Monte Carlo simulation , 1996 .

[49]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[50]  Ronald N. Allan,et al.  Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1996-1999 , 1984 .

[51]  Roy Billinton,et al.  Assessment of Reliability Worth , 1988 .

[52]  Piet M. T. Broersen,et al.  Finite sample properties of ARMA order selection , 2004, IEEE Transactions on Instrumentation and Measurement.

[53]  Roy Billinton,et al.  A minimum cost assessment method for composite generation and transmission system expansion planning , 1993 .

[54]  D. O. Koval,et al.  Application of customer interruption costs in transmission network reliability planning , 2001, 2001 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record (Cat. No.01CH37226).

[55]  Hua Chen,et al.  A sequential simulation technique for adequacy evaluation of generating systems including wind energy , 1996 .

[56]  Roy Billinton,et al.  Customer cost of electric service interruptions , 1989, Proc. IEEE.

[57]  Alain Pagès,et al.  System Reliability , 1986 .

[58]  R. N. Allan,et al.  Reliability Assessment of Generation Systems Containing Multiple Hydro Plant Using Simulation Techniques , 1989, IEEE Power Engineering Review.

[59]  O. Alsac,et al.  Fast Decoupled Load Flow , 1974 .

[60]  Roy Billinton,et al.  Hybrid approach for reliability evaluation of composite generation and transmission systems using Monte-Carlo simulation and enumeration technique , 1991 .

[61]  Roy Billinton,et al.  Predicting bulk electricity system performance indices , 2000, 2000 Canadian Conference on Electrical and Computer Engineering. Conference Proceedings. Navigating to a New Era (Cat. No.00TH8492).

[62]  R. Billinton,et al.  A Reliability Test System for Educational Purposes-Basic Data , 1989, IEEE Power Engineering Review.

[63]  Roy Billinton,et al.  Reliability Assessment of Large Electric Power Systems , 1988 .

[64]  Hannele Holttinen,et al.  Hourly wind power variations in the Nordic countries , 2005 .

[65]  R. Billinton,et al.  Deterministic/probabilistic contingency evaluation in composite generation and transmission systems , 2004, IEEE Power Engineering Society General Meeting, 2004..

[66]  M.V.F. Pereira,et al.  A new computational tool for composite reliability evaluation , 1992 .

[67]  Budget,et al.  Standard Industrial Classification Manual , 1987 .

[68]  Roy Billinton,et al.  Power-system reliability in perspective , 1984 .

[69]  Roy Billinton,et al.  Estimating customer outage costs due to a specific failure event , 2003 .

[70]  Roy Billinton,et al.  Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads , 1995 .

[71]  William H. Press,et al.  Numerical recipes in C. The art of scientific computing , 1987 .

[72]  Bernhard Ernst,et al.  Analysis of Wind Power Ancillary Services Characteristics with German 250-MW Wind Data , 1999 .

[73]  Djalma M. Falcao,et al.  Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments , 2001 .

[74]  M. Bollen,et al.  Operation of restructured power systems , 2001 .

[75]  Aaas News,et al.  Book Reviews , 1893, Buffalo Medical and Surgical Journal.

[76]  N.G. Hingorani,et al.  Flexible AC transmission , 1993, IEEE Spectrum.

[77]  Hua Chen,et al.  Assessment of risk-based capacity benefit factors associated with wind energy conversion systems , 1998 .

[78]  D. W. Scott On optimal and data based histograms , 1979 .

[79]  Roy Billinton,et al.  Predictive assessment of bulk-system-reliability performance indices , 1994 .

[80]  H. Stoll Least-Cost Electric Utility Planning , 1989 .

[81]  R. Billinton,et al.  Comprehensive Bibliography On Electrical Service Interruption Costs , 1983, IEEE Transactions on Power Apparatus and Systems.

[82]  G. C. Oliveira,et al.  Combining analytical models and Monte-Carlo techniques in probabilistic power system analysis , 1992 .

[83]  Roy Billinton,et al.  Reliability issues in today's electric power utility environment , 1997 .

[84]  R. E. Brown,et al.  Managing the risk of performance based rates , 2000 .

[85]  Roy Billinton,et al.  Impact of utilising sequential and nonsequential simulation techniques in bulk-electric-system reliability assessment , 2005 .

[86]  Jaime Román Úbeda,et al.  Sequential simulation applied to composite system reliability evaluation , 1992 .

[87]  J. Sherman,et al.  Adjustment of an Inverse Matrix Corresponding to a Change in One Element of a Given Matrix , 1950 .

[88]  Roy Billinton,et al.  A security based approach to composite power system reliability evaluation , 1992 .

[89]  V. Brandwajn,et al.  Efficient bounding method for linear contingency analysis , 1988 .

[90]  Roy Billinton,et al.  Application of sequential Monte Carlo simulation to evaluation of distributions of composite system indices , 1997 .

[91]  G. G. Stokes "J." , 1890, The New Yale Book of Quotations.

[92]  K. Carlsen,et al.  Operating under stress and strain [electrical power systems control under emergency conditions] , 1978, IEEE Spectrum.

[93]  R. Billinton,et al.  Bulk electric system well-being analysis using sequential Monte Carlo simulation , 2006, IEEE Transactions on Power Systems.

[94]  Roy Billinton,et al.  A system state transition sampling technique for reliability evaluation , 1994 .

[95]  R. Billinton,et al.  Utilization of time varying event-based customer interruption cost load shedding schemes , 2004, 2004 International Conference on Probabilistic Methods Applied to Power Systems.

[96]  R. Billinton,et al.  Historic performance-based distribution system risk assessment , 2004, IEEE Transactions on Power Delivery.

[97]  R. Billinton,et al.  Predicting bulk electricity system reliability performance indices using sequential Monte Carlo simulation , 2006, IEEE Transactions on Power Delivery.