An Integrated Framework for Generating and Revising Factory Schedules
暂无分享,去创建一个
[1] Stephen F. Smith,et al. Reactive Plan Revision , 1988, AAAI.
[2] Stephen F. Smith,et al. The Use of Multiple Problem Decompositions in Time Constrained Planning Tasks , 1985, IJCAI.
[3] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[4] Mark S. Fox,et al. Constraint-Directed Search: A Case Study of Job-Shop Scheduling , 1987 .
[5] Stephen F. Smith,et al. Constructing and Maintaining Detailed Production Plans: Investigations into the Development of Knowledge-Based Factory Scheduling Systems , 1986, AI Mag..
[6] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[7] Stephen F. Smith,et al. A Probabilistic Framework for Resource-Constrained Multi-Agent Planning , 1987, IJCAI.
[8] Stephen F. Smith,et al. FLEXIBLE SYSTEMS FOR THE DESIGN OF HEURISTIC ALGORITHMS IN COMPLEX OR DOMAINS , 1989 .
[9] Stephen F. Smith,et al. Management of Temporal Constraints for Factory Scheduling , 1987, Temporal Aspects in Information Systems.
[10] Stephen F. Smith,et al. Viewing scheduling as an opportunistic problem-solving process , 1988 .
[11] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .
[12] Peng Si Ow,et al. Focused Scheduling in Proportionate Flowshops , 1985 .
[13] James C. Bean,et al. Match-up real-time scheduling , 1985 .
[14] Victor R. Lesser,et al. The Hearsay-II Speech-Understanding System: Integrating Knowledge to Resolve Uncertainty , 1980, CSUR.