Hierarchical cross-training in work-in-process-constrained systems
暂无分享,去创建一个
[1] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[2] Donald D. Eisenstein,et al. A Production Line that Balances Itself , 1996, Oper. Res..
[3] Ronald G. Askin,et al. Throughput maximization in serial production lines with worksharing , 2006 .
[4] José Soeiro Ferreira,et al. A simulation analysis of sequencing rules in a flexible flowline , 1999, Eur. J. Oper. Res..
[5] John O. McClain,et al. Management of Worksharing Systems , 2000, Manuf. Serv. Oper. Manag..
[6] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[7] William C. Jordan,et al. Principles on the benefits of manufacturing process flexibility , 1995 .
[8] I. Winfield. Japanese manufacturing techniques , 1994 .
[9] John B. Kidd,et al. Toyota Production System , 1993 .
[10] Rhonda Righter,et al. Dynamic load balancing with flexible workers , 2006, Advances in Applied Probability.
[11] Saif Benjaafar,et al. Modeling and analysis of flexible queueing systems , 2004 .
[12] Ronald G. Askin,et al. Dynamic task assignment for throughput maximization with worksharing , 2006, Eur. J. Oper. Res..
[13] William C. Jordan,et al. Chained cross-training of assembly line workers , 2004 .
[14] John O. McClain,et al. “On-the-fly” line balancing with very little WIP , 1992 .
[15] Seyed M. R. Iravani,et al. Structural Flexibility: A New Perspective on the Design of Manufacturing and Service Operations , 2005, Manag. Sci..
[16] John O. McClain,et al. Self-buffering, self-balancing, self-flushing production lines , 1996 .
[17] Hamilton Emmons,et al. Off-Day Scheduling with Hierarchical Worker Categories , 1991, Oper. Res..
[18] Seyed M. R. Iravani,et al. Optimal dynamic assignment of a flexible worker on an open production line with specialists , 2006, Eur. J. Oper. Res..
[19] C. Pegels. The Toyota Production System , 1984 .
[20] Wallace J. Hopp,et al. Agile workforce evaluation: a framework for cross-training and coordination , 2004 .
[21] Wallace J. Hopp,et al. Factors affecting opportunity of worksharing as a dynamic line balancing mechanism , 2002 .
[22] Wallace J. Hopp,et al. Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract , 2002, Manuf. Serv. Oper. Manag..
[23] Rangarajan Narasimhan,et al. An Algorithm For Multiple Shift Scheduling of Hierarchical Workforce On Four-Day Or Three-Day Workweeks , 2000 .
[24] Wallace J. Hopp,et al. Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers , 2004, Manag. Sci..
[25] Wallace J. Hopp,et al. Serial Agile Production Systems with Automation , 2005, Oper. Res..
[26] Wallace J. Hopp,et al. Performance Opportunity for Workforce Agility in Collaborative and Noncollaborative Work Systems , 2001 .
[27] Alain Billionnet. Integer programming to schedule a hierarchical workforce with variable demands , 1999, Eur. J. Oper. Res..