Hierarchical cross-training in work-in-process-constrained systems

We study Work-In-Process (WIP)-constrained flowlines staffed by partially cross-trained workers with hierarchical skill sets. We characterize the optimal worker-to-task assignment policy for CONWIP systems with two workers and general stochastic processing times. This leads us to the “fixed-before-shared” principle, which states that a flexible worker should process a task he/she is uniquely qualified for before helping other workers with shared tasks. To provide insights on the performance opportunity of hierarchical cross-training in systems with limited WIP, we provide a complete characterization of the optimal policy and closed-form expressions of the resulting throughput for the case of exponential processing times. We extend our results to the more general case of floater workers, and illustrate their applicability to various real-world systems. Our analysis shows that hierarchical cross-training can provide significant benefits, but should be implemented with care in WIP-constrained environments such as those making use of pull systems.

[1]  Wallace J. Hopp,et al.  To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..

[2]  Donald D. Eisenstein,et al.  A Production Line that Balances Itself , 1996, Oper. Res..

[3]  Ronald G. Askin,et al.  Throughput maximization in serial production lines with worksharing , 2006 .

[4]  José Soeiro Ferreira,et al.  A simulation analysis of sequencing rules in a flexible flowline , 1999, Eur. J. Oper. Res..

[5]  John O. McClain,et al.  Management of Worksharing Systems , 2000, Manuf. Serv. Oper. Manag..

[6]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[7]  William C. Jordan,et al.  Principles on the benefits of manufacturing process flexibility , 1995 .

[8]  I. Winfield Japanese manufacturing techniques , 1994 .

[9]  John B. Kidd,et al.  Toyota Production System , 1993 .

[10]  Rhonda Righter,et al.  Dynamic load balancing with flexible workers , 2006, Advances in Applied Probability.

[11]  Saif Benjaafar,et al.  Modeling and analysis of flexible queueing systems , 2004 .

[12]  Ronald G. Askin,et al.  Dynamic task assignment for throughput maximization with worksharing , 2006, Eur. J. Oper. Res..

[13]  William C. Jordan,et al.  Chained cross-training of assembly line workers , 2004 .

[14]  John O. McClain,et al.  “On-the-fly” line balancing with very little WIP , 1992 .

[15]  Seyed M. R. Iravani,et al.  Structural Flexibility: A New Perspective on the Design of Manufacturing and Service Operations , 2005, Manag. Sci..

[16]  John O. McClain,et al.  Self-buffering, self-balancing, self-flushing production lines , 1996 .

[17]  Hamilton Emmons,et al.  Off-Day Scheduling with Hierarchical Worker Categories , 1991, Oper. Res..

[18]  Seyed M. R. Iravani,et al.  Optimal dynamic assignment of a flexible worker on an open production line with specialists , 2006, Eur. J. Oper. Res..

[19]  C. Pegels The Toyota Production System , 1984 .

[20]  Wallace J. Hopp,et al.  Agile workforce evaluation: a framework for cross-training and coordination , 2004 .

[21]  Wallace J. Hopp,et al.  Factors affecting opportunity of worksharing as a dynamic line balancing mechanism , 2002 .

[22]  Wallace J. Hopp,et al.  Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract , 2002, Manuf. Serv. Oper. Manag..

[23]  Rangarajan Narasimhan,et al.  An Algorithm For Multiple Shift Scheduling of Hierarchical Workforce On Four-Day Or Three-Day Workweeks , 2000 .

[24]  Wallace J. Hopp,et al.  Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers , 2004, Manag. Sci..

[25]  Wallace J. Hopp,et al.  Serial Agile Production Systems with Automation , 2005, Oper. Res..

[26]  Wallace J. Hopp,et al.  Performance Opportunity for Workforce Agility in Collaborative and Noncollaborative Work Systems , 2001 .

[27]  Alain Billionnet Integer programming to schedule a hierarchical workforce with variable demands , 1999, Eur. J. Oper. Res..