Lot streaming and scheduling heuristics for m -machine no-wait flowshops

[1]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[2]  A. Z. Szendrovits Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .

[3]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[4]  Eugene L. Lawler,et al.  The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization , 1985 .

[5]  William G. Truscott,et al.  Scheduling production activities in multi-stage batch manufacturing systems , 1985 .

[6]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[7]  Chris N. Potts,et al.  Flow shop scheduling with lot streaming , 1989 .

[8]  David F. Pyke,et al.  Solution Procedures for the Lot‐Streaming Problem , 1990 .

[9]  Lawrence. Davis,et al.  Handbook Of Genetic Algorithms , 1990 .

[10]  Chris N. Potts,et al.  Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .

[11]  David Connolly,et al.  General Purpose Simulated Annealing , 1992 .

[12]  Gilbert Laporte,et al.  New Insertion and Postoptimization Procedures for the Traveling Salesman Problem , 1992, Oper. Res..

[13]  Kenneth R. Baker,et al.  A comparative study of lot streaming procedures , 1993 .

[14]  Kazuhiko Kawamura,et al.  Managing genetic search in job shop scheduling , 1993, IEEE Expert.

[15]  G. Steiner,et al.  BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .

[16]  Kenneth R. Baker,et al.  Basic Techniques for Lot Streaming , 1993, Oper. Res..

[17]  Taxpayer compliance of the self-employed: estimates from household spending data , 1993 .

[18]  Hisao Ishibuchi,et al.  Performance evaluation of genetic algorithms for flowshop scheduling problems , 1994, Proceedings of the First IEEE Conference on Evolutionary Computation. IEEE World Congress on Computational Intelligence.

[19]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[20]  Chris N. Potts,et al.  Lot streaming in three-stage production processes , 1994 .

[21]  Chuen-Lung Chen,et al.  An application of genetic algorithms for flow shop problems , 1995 .

[22]  R. Vickson Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .

[23]  Kenneth R. Baker,et al.  Lot streaming in the two-machine flow shop with setup times , 1995, Ann. Oper. Res..

[24]  Chelliah Sriskandarajah,et al.  A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..

[25]  Zbigniew Michalewicz,et al.  Genetic Algorithms + Data Structures = Evolution Programs , 1996, Springer Berlin Heidelberg.

[26]  M.-C. Portmann,et al.  Scheduling methodology: optimization and compu-search approaches I , 1997 .

[27]  C. Sriskandarajah,et al.  Lot streaming and scheduling multiple products in two-machine no-wait flowshops , 1999 .