Assessment of Urban Water Supply Options by Using Fuzzy Possibilistic Theory

A comprehensible framework for assessing water supply risk based on existing and under-construction projects is provided. In the proposed framework, the risk factors of current and future water supply options were first investigated using the Fuzzy Delphi method. Then, according to a survey of experts, the probability of the risk for each water supply option was assessed. Markowitz’s theory was used, in the form of an opportunity from the optimistic to the most pessimistic possible case of the risk pool. The results showed that the framework based on the Fuzzy Delphi and possibility theory is befitting to information gathered from experts. Such a framework can provide a simple method to apply the proposed methodology to other water management projects, where, despite the high level of investment, there is no clear idea of the risks and their consequences.

[1]  Peijun Guo,et al.  Portfolio selection based on upper and lower exponential possibility distributions , 1999, Eur. J. Oper. Res..

[2]  Jun g Sik Kong,et al.  Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM , 2009 .

[3]  H Yokoi,et al.  Study on the introduction of hazard analysis and critical control point (HACCP) concept of the water quality management in water supply systems. , 2006, Water science and technology : a journal of the International Association on Water Pollution Research.

[4]  Gordon H. Huang,et al.  An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty , 2006 .

[5]  Mathieu Serrurier,et al.  Maximum-likelihood principle for possibility distributions viewed as families of probabilities , 2011, 2011 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE 2011).

[6]  Billie Turner,et al.  Vulnerability and resilience: Coalescing or paralleling approaches for sustainability science? , 2010 .

[7]  Mark D Scrimshaw,et al.  Hazard and risk assessment for indirect potable reuse schemes: An approach for use in developing Water Safety Plans. , 2010, Water research.

[8]  K. Madani Water management in Iran: what is causing the looming crisis? , 2014, Journal of Environmental Studies and Sciences.

[9]  Aiman Ziout,et al.  Industrial Product Service System: A Case Study from the Agriculture Sector , 2015 .

[10]  Lorna Fewtrell,et al.  Water safety plans: managing drinking-water quality from catchment to consumer , 2005 .

[11]  Jirapong Pipattanapiwong Development of multi-party risk and uncertainty management process for an infrastructure project , 2004 .

[12]  Gilles Mauris,et al.  Transformation of Bimodal Probability Distributions Into Possibility Distributions , 2010, IEEE Transactions on Instrumentation and Measurement.

[13]  Y. P. Li,et al.  A multistage fuzzy-stochastic programming model for supporting sustainable water-resources allocation and management , 2009, Environ. Model. Softw..

[14]  M. Palmer,et al.  River restoration: the fuzzy logic of repairing reaches to reverse catchment scale degradation. , 2011, Ecological applications : a publication of the Ecological Society of America.

[15]  M. Mozafari,et al.  Water leakage paths in the Doosti Dam, Turkmenistan and Iran , 2011, Environmental Earth Sciences.

[16]  Neil McIntyre,et al.  Uncertainty and risk in water quality modelling and management , 2003 .

[17]  Slobodan P. Simonovic,et al.  Managing Water Resources: Methods and Tools for a Systems Approach , 2008 .

[18]  Desheng Wang,et al.  Tetrahedral mesh generation and optimization based on centroidal Voronoi tessellations , 2003 .

[19]  Philippe Lagacherie,et al.  A possibility theory approach for estimating available water capacity from imprecise information contained in soil databases , 2001 .

[20]  Dennis R. Helsel,et al.  A Retrospective Analysis on the Occurrence of Arsenic in Ground-Water Resources of the United States and Limitations in Drinking-Water-Supply Characterizations , 2000 .

[21]  Asoka Jayaratne Application of a risk management system to improve drinking water safety. , 2008, Journal of water and health.

[22]  Guohe Huang,et al.  Inexact two-stage stochastic robust optimization model for water resources management under uncertainty. , 2009 .

[23]  M. Parlange,et al.  A framework to implement Stakeholder participation in environmental projects. , 2012, Journal of environmental management.

[24]  T. Simon Environmental Risk Assessment: A Toxicological Approach , 2014 .

[25]  Hosseini Seyed Mehran,et al.  Offering a New Approach for Determination of Fuzzy Numbers Similarity by Using TOPSIS Method and its Application in Fuzzy Risk Analysis , 2010 .

[26]  Guo H. Huang,et al.  A two-stage programming approach for water resources management under randomness and fuzziness , 2010, Environ. Model. Softw..

[27]  Peijun Guo,et al.  Portfolio selection based on fuzzy probabilities and possibility distributions , 2000, Fuzzy Sets Syst..

[28]  Éloi Bossé,et al.  Approximation techniques for the transformation of fuzzy sets into random sets , 2008, Fuzzy Sets Syst..

[29]  Guo H. Huang,et al.  An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty , 2005, Eur. J. Oper. Res..

[30]  Erik S. Smith An Application of Fuzzy Logic Control to a Classical Military Tracking Problem , 1995 .

[32]  M. Gebremichael,et al.  Optimizing cropping area by proposing a combined water-energy productivity function for Neyshabur Basin, Iran , 2019, Agricultural Water Management.

[33]  Kurt Fedra,et al.  Optimization methods applied for sustainable management of water-scarce basins , 2008 .

[34]  C. J. Griffith,et al.  The clinical application of hazard analysis critical control points (HACCP) , 2005 .

[35]  K. Davary,et al.  Enhancing Flood Hazard Estimation Methods on Alluvial Fans Using an Integrated Hydraulic, Geological and Geomorphological Approach , 2017 .

[36]  Y. P. Li,et al.  Planning Regional Water Resources System Using an Interval Fuzzy Bi-Level Programming Method , 2010 .

[37]  Sherif Ali Mohtady Mohamed,et al.  Modelling project investment decisions under uncertainty using possibility theory , 2001 .