An integrated approach for demand forecasting and inventory management optimisation of spare parts

In this paper, we develop and test an advanced model, based on discrete-event simulation, whose purpose is to forecast the demand of spare parts during the whole lifetime of a complex product, such as, for instance, an industrial machine. To run the model, the relevant data of the product manufactured by a targeted company should be collected. With those data, the model provides an estimate of the optimal level of spare parts inventory the company should keep available. The data provided by the model are subsequently applied to a case example, referring to a hypothesised company, manufacturing industrial plants. The application is carried out considering two scenarios, i.e., a 'traditional' and an 'advanced' approach for demand forecasting, this latter reflecting the circumstance where the company makes use of the proposed forecasting method. The comparison of the outcomes obtained in the two scenarios highlights the efficiency and resolution capacity of the model developed.

[1]  Liliane Pintelon,et al.  Criticality classification of spare parts: A case study , 2012 .

[2]  Arnold Neumaier,et al.  Mathematical Modeling of the Dynamics of Macroscopic Structural Transformations in Self-Propagating High-Temperature Synthesis , 2004 .

[3]  Ivo Adan,et al.  A trade off between emergency repair and inventory investment , 1998 .

[4]  Bowon Kim,et al.  Optimal pricing, EOL (end of life) warranty, and spare parts manufacturing strategy amid product transition , 2008, Eur. J. Oper. Res..

[5]  Beatriz Abdul-Jalbar,et al.  Single cycle policies for the one-warehouse N-retailer inventory/distribution system , 2006 .

[6]  Ivo J. B. F. Adan,et al.  Reducing Costs of Spare Parts Supply Systems via Static Priorities , 2009, Asia Pac. J. Oper. Res..

[7]  David F. Pyke Priority repair and dispatch policies for reparable-item logistics systems , 1990 .

[8]  Marcello Braglia,et al.  Multi‐attribute classification method for spare parts inventory management , 2004 .

[9]  Awi Federgruen,et al.  Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..

[10]  S. Gass,et al.  Linear Programming: Methods and Applications. , 1960 .

[11]  Manuel D. Rossetti,et al.  An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system , 2007 .

[12]  Linhan Guo,et al.  Optimizing Spare Parts Inventory for Time-varying Task , 2013 .

[13]  José Luis Duarte Ribeiro,et al.  Establishment of a maintenance plan based on quantitative analysis in the context of RCM in a JIT production scenario , 2014, Reliab. Eng. Syst. Saf..

[14]  A. van Harten,et al.  Using repair priorities to reduce stock investment in spare part networks , 2005, Eur. J. Oper. Res..

[15]  Eleonora Bottani,et al.  An empirical study on the relationships between maintenance policies and approaches among Italian companies , 2014 .

[16]  J. D. Croston Forecasting and Stock Control for Intermittent Demands , 1972 .

[17]  Steven Vajda,et al.  Linear Programming. Methods and Applications , 1964 .

[18]  Ilya Levner,et al.  Modeling Multi-Echelon Multi-Supplier Repairable Inventory Systems with Backorders , 2010 .

[19]  Janne Huiskonen,et al.  Maintenance spare parts logistics: Special characteristics and strategic choices , 2001 .

[20]  A. Bacchetti,et al.  Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice , 2012 .

[21]  Eleonora Bottani,et al.  A simulation approach for spare parts demand forecasting and inventory management optimization , 2013 .

[22]  Yael Perlman,et al.  Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity , 2001, J. Oper. Res. Soc..

[23]  Tore Markeset,et al.  Application of reliability models with covariates in spare part prediction and optimization - A case study , 2014, Reliab. Eng. Syst. Saf..

[24]  Gary D. Scudder,et al.  Priority Scheduling Rules for Repairable Inventory Systems , 1982 .

[25]  Rainer Lasch,et al.  An Integrated Logistics Model of Spare Parts Maintenance Planning within the Aviation Industry , 2012 .

[26]  Eleonora Bottani,et al.  Optimisation of storage allocation in order picking operations through a genetic algorithm , 2012 .

[27]  Andrei Sleptchenko,et al.  Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems , 2002 .

[28]  Dirk L. van Oudheusden,et al.  Inventory models for fast moving spare parts subject to “sudden death” obsolescence , 1996 .

[29]  Augustine O. Esogbue,et al.  Decision criteria and optimal inventory processes , 1999 .

[30]  Bob Huisman,et al.  Maintenance spare parts planning and control: a framework for control and agenda for future research , 2014 .

[31]  L. Fortuin,et al.  Stocking strategy for service parts : a case study , 2000 .

[32]  Warren B. Powell,et al.  Approximate dynamic programming for management of high‐value spare parts , 2009, Journal of Manufacturing Technology Management.

[33]  Mark M. Meerschaert,et al.  Mathematical Modeling , 2014, Encyclopedia of Social Network Analysis and Mining.

[34]  Tuomo Honkanen,et al.  Modelling industrial maintenance systems and the effects of automatic condition monitoring , 2004 .

[35]  W. J. Kennedy,et al.  An overview of recent literature on spare parts inventories , 2002 .

[36]  W. Prager On the Caterer Problem , 1956 .

[37]  Yael Perlman,et al.  Centralized decision of internal transfer-prices with congestion externalities for two modes of repair with limited repair capacity , 2007, J. Oper. Res. Soc..