Analytical approach for economic risk quantification of large engineering projects

A consistent,four moment based approach for quantifying time and economic risks is presented. The goal is to produce a computationally efficient tool that can be used to explore economic feasibility and tradeoffs between cost and time performance versus risk as a function of various strategies for executing and sequencing major work packages. A three level hierarchy of parameters is used, starting with time, cost and revenue performance at the work package/revenue stream level to rate of return at the overall project level. Use of a four moment approach and Pearson distributions at all levels of the hierarchy permit the formulation of a consistent and readily automated approach to risk measurement. Treatment of correlations is included. A modified form of PNET is presented for quantifying time uncertainty. Use of limiting values (0, 1) of the PNET transitional correlation provide bounds for decision parameters.

[1]  Hon-Shiang Lau,et al.  A review of the statistical foundation of a class of probabilistic planning models , 1980, Comput. Oper. Res..

[2]  J. Hull The evaluation of risk in business investment , 1980 .

[3]  Hon-Shiang Lau,et al.  A Four-Moments Alternative to Simulation for a Class of Stochastic Management Models , 1982 .

[4]  N. L. Johnson,et al.  Table of percentage points of Pearson curves, for given √β1 and β2, expressed in standard measure , 1963 .

[5]  F. Hillier THE DERIVATION OF PROBABILISTIC INFORMATION FOR THE EVALUATION OF RISKY INVESTMENTS , 1963 .

[6]  M. Kendall,et al.  The advanced theory of statistics , 1945 .

[7]  Ali Jaafari Project Viability and Economic Risk Analysis , 1988 .

[8]  D. O. Cooper,et al.  A Simple Way of Developing a Probability Distribution of Present Value , 1976 .

[9]  James E. Diekmann Probabilistic Estimating: Mathematics and Applications , 1983 .

[10]  Alan D. Russell,et al.  Elicitation of subjective probabilities for economic risk analysis: An investigation , 1993 .

[11]  M. Ranasinghe,et al.  TREATMENT OF CORRELATION FOR RISK ANALYSIS OF ENGINEERING PROJECTS , 1992 .

[12]  Louis Y. Pouliquen,et al.  Risk analysis in project appraisal , 1970 .

[13]  Joseph J. Moder,et al.  Judgment Estimates of the Moments of Pert Type Distributions , 1968 .

[14]  J. Perry,et al.  RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .

[15]  Milton E. Harr,et al.  Reliability-Based Design in Civil Engineering , 1987 .

[16]  D. Keefer,et al.  Three-Point Approximations for Continuous Random Variables , 1983 .

[17]  Peter Ayton,et al.  The psychology of forecasting , 1986 .

[18]  David V. Budescu,et al.  Subjective estimation of precise and vague uncertainties. , 1987 .

[19]  Peter S. Jackson A Second-Order Moments Method for Uncertainty Analysis , 1982, IEEE Transactions on Reliability.

[20]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[21]  A. Tversky,et al.  On the Reconciliation of Probability Assessments , 1979 .

[22]  Colin M. Sorrill Risk Analysis for Large Projects: Models, Methods and Cases , 1987 .

[23]  Keith C. Crandall Analysis of Schedule Simulations , 1977 .

[24]  Lawrence L. Kupper,et al.  Probability, statistics, and decision for civil engineers , 1970 .

[25]  A. Ang,et al.  Analysis of Activity Networks under Uncertainty , 1975 .

[26]  Wilson H. Tang,et al.  Probability concepts in engineering planning and design , 1984 .

[27]  R. Howard Proximal Decision Analysis , 1971 .

[28]  E. S. Pearson,et al.  Approximate means and standard deviations based on distances between percentage points of frequency curves , 1965 .

[29]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .

[30]  Singiresu S Rao,et al.  Reliability-Based Design , 1992 .

[31]  Carl-Axel S. Staël von Holstein,et al.  Exceptional Paper---Probability Encoding in Decision Analysis , 1975 .

[32]  James N. Siddall,et al.  Analytical decision-making in engineering design , 1972 .

[33]  C. Perry,et al.  Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis , 1975 .

[34]  Chris Hendrickson,et al.  Hierarchical Rule‐Based Activity Duration Estimation , 1987 .

[35]  George P. Huber,et al.  METHODS FOR QUANTIFYING SUBJECTIVE PROBABILITIES AND MULTI‐ATTRIBUTE UTILITIES*† , 1974 .

[36]  J. C. Hull The Accuracy of the Means and Standard Deviations of Subjective Probability Distributions , 1978 .

[37]  J. K. Ord,et al.  Families of frequency distributions , 1973 .

[38]  David V. Budescu,et al.  Encoding subjective probabilities: A psychological and psychometric review , 1983 .