Selecting allowance policies for improved job shop performance
暂无分享,去创建一个
[1] G. Ragatz,et al. A simulation analysis of due date assignment rules , 1984 .
[2] James K. Weeks,et al. A Methodology for Assigning Minimum Cost Due-Dates , 1977 .
[3] John J. Kanet. Job shop scheduling to meet due dates: a simulation study , 1979 .
[4] T.C.E. Cheng. Simulation study of job shop scheduling with due dates , 1988 .
[5] John J. Kankt,et al. Manufacturing systems with forbidden early order departure , 1984 .
[6] Jack C. Hayya,et al. Priority dispatching with operation due dates in a job shop , 1982 .
[7] Phillip L. Carter,et al. Scheduling, sequencing, and dispatching: Alternative perspectives , 1986 .
[8] K. R. Baker,et al. An investigation of due-date assignment rules with constrained tightness , 1981 .
[9] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[10] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[11] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[12] Douglas A. Elvers,et al. The Sensitivity of the Relative Effectiveness of Job Shop Dispatching Rules with Respect to Various Arrival Distributions , 1974 .
[13] Samuel Eilon,et al. Due dates in job shop scheduling , 1976 .
[14] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[15] Shigeji Miyazaki,et al. Combined scheduling system for reducing job tardiness in a job shop , 1981 .