Operator assignment/reassignment problems in incremental cell formation
暂无分享,去创建一个
[1] Peter Cappelli,et al. New Work Systems and Skill Requirements. , 1994 .
[2] G. Margaret Fazakerley,et al. A research report on the human aspects of group technology and cellular manufacture , 1976 .
[3] Bopaya Bidanda,et al. Worker assignment in cellular manufacturing considering technical and human skills , 2002 .
[4] Bopaya Bidanda,et al. Human related issues in manufacturing cell design, implementation, and operation: a review and survey , 2005, Comput. Ind. Eng..
[5] Geetha Srinivasan,et al. Heuristics for operator allocation and sequencing in product-line-cells with manually operated machines , 1997 .
[6] Hokey Min,et al. Simultaneous formation of machine and human cells in group technology: a multiple objective approach , 1993 .
[7] Jack R. Meredith,et al. A comparison of cellular manufacturing research presumptions with practice , 1999 .
[8] Danny J. Johnson,et al. Empirical findings on manufacturing cell design , 2000 .
[9] Ronald G. Askin,et al. Forming effective worker teams for cellular manufacturing , 2001 .
[10] Geetha Srinivasan,et al. Incremental cell formation considering alternative machines , 2002 .
[11] Gürsel A. Süer,et al. Optimal operator assignment and cell loading when lot-splitting is allowed , 1998 .
[12] Gürsel A. Süer,et al. Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells , 2005, Comput. Ind. Eng..