Generalized line criterion for Gauss-Seidel method
暂无分享,去创建一个
[1] Leônidas de Oliveira Brandão,et al. A mixed dynamics approach for linear corridor policies: A revisitation of dynamic setup scheduling and flow control in manufacturing systems , 1995, Discret. Event Dyn. Syst..
[2] Thomas I. Seidman,et al. Some kanban-controlled manufacturing systems: a first stability analysis , 1996 .
[3] James Renegar,et al. A polynomial-time algorithm, based on Newton's method, for linear programming , 1988, Math. Program..
[4] Panganamala Ramana Kumar,et al. Distributed scheduling of flexible manufacturing systems: stability and performance , 1994, IEEE Trans. Robotics Autom..
[5] Gene H. Golub,et al. Matrix computations , 1983 .
[6] John N. Tsitsiklis,et al. Parallel and distributed computation , 1989 .
[7] Stanley B. Gershwin,et al. Dynamic setup scheduling and flow control in manufacturing systems , 1991, Discret. Event Dyn. Syst..
[8] Åke Björck,et al. Numerical Methods , 1995, Handbook of Marine Craft Hydrodynamics and Motion Control.
[9] Elijah Polak,et al. Optimization: Algorithms and Consistent Approximations , 1997 .