Integrated hub location and flow processing schedule problem under renewable capacity constraint
暂无分享,去创建一个
[1] Stefan Nickel,et al. Multi-product Capacitated Single-Allocation Hub Location Problems: Formulations and Inequalities , 2014 .
[2] Sibel A. Alumur,et al. Network hub location problems: The state of the art , 2008, Eur. J. Oper. Res..
[3] Sibel A. Alumur,et al. Shipment scheduling in hub location problems , 2018, Transportation Research Part B: Methodological.
[4] Morton E. O'Kelly,et al. Twenty-Five Years of Hub Location Research , 2012, Transp. Sci..
[5] M. Guignard. Lagrangean relaxation , 2003 .
[6] Christopher D. Geiger,et al. Minimizing the completion time of the transfer operations in a central parcel consolidation terminal with unequal-batch-size inbound trailers , 2008, Comput. Ind. Eng..
[7] Christopher D. Geiger,et al. The parcel hub scheduling problem: A simulation-based solution approach , 2005, Comput. Ind. Eng..
[8] Douglas L. McWilliams. Simulation-based scheduling for parcel consolidation terminals: a comparison of iterative improvement and simulated annealing , 2005, Proceedings of the Winter Simulation Conference, 2005..
[9] Canrong Zhang,et al. MIP models and a hybrid method for the capacitated air-cargo network planning and scheduling problems , 2017 .
[10] Dariush Moradinezhad,et al. Improved and competitive algorithms for large scale multiple resource-constrained project-scheduling problems , 2014 .
[11] James F. Campbell. Hub location for time definite transportation , 2009, Comput. Oper. Res..
[12] Hossein Karimi,et al. A bi-objective incomplete hub location-routing problem with flow shipment scheduling , 2018 .
[13] Morton E. O'Kelly,et al. The Location of Interacting Hub Facilities , 1986, Transp. Sci..
[14] Douglas L. McWilliams. Iterative improvement to solve the parcel hub scheduling problem , 2010, Comput. Ind. Eng..
[15] Sibel A. Alumur,et al. The design of single allocation incomplete hub networks , 2009 .
[16] João C. N. Clímaco,et al. Capacitated single allocation hub location problem - A bi-criteria approach , 2008, Comput. Oper. Res..
[17] Mahdi Bashiri,et al. Integrated strategic and tactical planning in a supply chain network design with a heuristic solution method , 2013, Comput. Oper. Res..
[18] M. O'Kelly,et al. Activity Levels at Hub Facilities in Interacting Networks , 2010 .
[19] Iván A. Contreras,et al. Perspectives on modeling hub location problems , 2020, Eur. J. Oper. Res..
[20] Rex S. Toh,et al. THE IMPACT OF HUB AND SPOKE NETWORK CENTRALIZATION AND ROUTE MONOPOLY ON DOMESTIC AIRLINE PROFITABILITY , 1985 .
[21] M. O'Kelly,et al. A quadratic integer program for the location of interacting hub facilities , 1987 .
[22] Zhongzhen Yang,et al. Design of timetable for airport coach based on ‘time–space’ network and passenger’s trip chain , 2015 .
[23] Jan K. Brueckner,et al. A MODEL OF SCHEDULING IN AIRLINE NETWORKS: HOW A HUB-AND-SPOKE SYSTEM AFFECTS FLIGHT FREQUENCY, FARES AND WELFARE , 2001 .
[24] Ehsan Nikbakhsh,et al. Hub location problems: A review of models, classification, solution techniques, and applications , 2013, Comput. Ind. Eng..
[25] P. N. Ram Kumar,et al. Simulated annealing-based algorithm for the capacitated hub routing problem , 2013 .
[26] Andreas T. Ernst,et al. Efficient algorithms for the uncapac-itated single allocation p-hub median problem , 1996 .