Tool capacity planning in semiconductor manufacturing
暂无分享,去创建一个
[1] Yi-Feng Hung,et al. A new formulation technique for alternative material planning—an approach for semiconductor bin allocation planning , 1997 .
[2] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[3] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[4] Robert C. Leachman,et al. On Capacity Modeling for Production Planning with Alternative Machine Types , 1992 .
[5] Gabriel R. Bitran,et al. Hierarchical Production Planning: A Two-Stage System , 1982, Oper. Res..
[6] Ian C. Parmee,et al. Optimization in industry , 2002 .
[7] Jayashankar M. Swaminathan. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty , 2000, Eur. J. Oper. Res..
[8] Jayashankar M. Swaminathan,et al. Tool procurement planning for wafer fabrication facilities: a scenario-based approach , 2002 .
[9] Reha Uzsoy,et al. A capacity allocation problem with integer side constraints , 1998, Eur. J. Oper. Res..
[10] Kenneth Fordyce,et al. IBM Burlington's Logistics Management System , 1990 .
[11] Kenneth Fordyce,et al. A Dynamically Generated Rapid Response Capacity Planning Model for Semiconductor Fabrication Facilities , 1995 .
[12] Gabriel R. Bitran,et al. Hierarchical Production Planning: A Single Stage System , 1981, Oper. Res..