Aging failure model of circuit breakers equipped with condition monitoring systems

[1]  Kishor S. Trivedi,et al.  Closed-form analytical results for condition-based maintenance , 2002, Reliab. Eng. Syst. Saf..

[2]  Wenyuan Li,et al.  Incorporating a Condition Monitoring Based Aging Failure Model of a Circuit Breaker in Substation Reliability Assessment , 2015, IEEE Transactions on Power Systems.

[3]  Hamid Reza Golmakani Condition-based inspection scheme for condition-based maintenance , 2012 .

[4]  Francisco Herrera,et al.  Fuzzy-rough imbalanced learning for the diagnosis of High Voltage Circuit Breaker maintenance: The SMOTE-FRST-2T algorithm , 2016, Eng. Appl. Artif. Intell..

[5]  Ali Asghar Razi-Kazemi,et al.  Applicability of auxiliary contacts in circuit breaker online condition assessment , 2015 .

[6]  María Dolores Berrade,et al.  Imperfect inspection and replacement of a system with a defective state: A cost and reliability analysis , 2013, Reliab. Eng. Syst. Saf..

[7]  Xin Geng,et al.  Research and realization of on-line monitoring system for high voltage circuit breaker based on ZigBee technology , 2009, 2009 IEEE International Conference on Control and Automation.

[8]  Chanan Singh,et al.  The effect of transformer maintenance parameters on reliability and cost: a probabilistic model , 2004 .

[9]  Ming-Ta Yang,et al.  Realization of circuit breaker condition-based maintenance using optimal contact wear equation by the modified NM-PSO algorithm: Circuit Breaker Condition-based Maintenance , 2016 .

[10]  Anton Janssen,et al.  International Surveys on Circuit-Breaker Reliability Data for Substation and System Studies , 2014, IEEE Transactions on Power Delivery.

[11]  Jyh-Cherng Gu,et al.  An intelligent maintenance model to assess the condition‐based maintenance of circuit breakers , 2015 .

[12]  Hamid Reza Golmakani,et al.  Optimal age-based inspection scheme for condition-based maintenance using A* search algorithm , 2012 .

[13]  P. L. Fletcher,et al.  A summary of the final results and conclusions of the second international enquiry on the reliability of high voltage circuit-breakers , 1995 .

[14]  Tommie Lindquist,et al.  Circuit breaker failure data and reliability modelling , 2008 .

[15]  M. Kezunovic,et al.  Sensitivity Analysis on the Probabilistic Maintenance Model of Circuit Breaker , 2006, 2006 International Conference on Probabilistic Methods Applied to Power Systems.

[16]  T.M. Welte Using State Diagrams for Modeling Maintenance of Deteriorating Systems , 2009, IEEE Transactions on Power Systems.

[17]  Cristiano Alexandre Virgínio Cavalcante,et al.  Modelling quality in replacement and inspection maintenance , 2012 .

[18]  H. Borsi,et al.  Life management of SF6 circuit breakers based on monitoring and diagnosis , 2009, IEEE Electrical Insulation Magazine.

[19]  María Dolores Berrade,et al.  Modelling imperfect inspection over a finite horizon , 2013, Reliab. Eng. Syst. Saf..

[20]  Liu Jian,et al.  LS-SVM based substation circuit breakers maintenance scheduling optimization , 2015 .

[21]  Francisco Germán Badía,et al.  Optimal inspection and preventive maintenance of units with revealed and unrevealed failures , 2002, Reliab. Eng. Syst. Saf..

[22]  J. L. Guardado,et al.  A model for optimizing maintenance policy for power equipment , 2015 .

[23]  Vladica Mijailovic Probabilistic method for planning of maintenance activities of substation components , 2003 .

[24]  Jose Roberto Sanches Mantovani,et al.  A new approach for reliability-centered maintenance programs in electric power distribution systems based on a multiobjective genetic algorithm , 2016 .

[25]  Matti Lehtonen,et al.  Circuit-Breaker Automated Failure Tracking Based on Coil Current Signature , 2014, IEEE Transactions on Power Delivery.

[26]  Swasti R. Khuntia,et al.  A literature survey on asset management in electrical power [transmission and distribution] system , 2016 .

[27]  Vladimiro Miranda,et al.  Substations SF6 circuit breakers: Reliability evaluation based on equipment condition , 2017 .

[28]  Panida Jirutitijaroen,et al.  A realistic maintenance model based on a new state diagram , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.

[29]  María Dolores Berrade,et al.  Maintenance scheduling of a protection system subject to imperfect inspection and replacement , 2012, Eur. J. Oper. Res..

[30]  Michael Pecht,et al.  A framework for cost-effective and accurate maintenance combining CBM RCM and data fusion , 2009, 2009 8th International Conference on Reliability, Maintainability and Safety.

[31]  R. Garzon High Voltage Circuit Breakers : Design and Applications , 2002 .

[32]  M. Kezunovic,et al.  Automated Circuit Breaker Monitoring , 2007, 2007 IEEE Power Engineering Society General Meeting.

[33]  George J. Anders,et al.  Probabilistic evaluation of the effect of maintenance on reliability. An application [to power systems] , 1998 .