Integrating decisions with advance supply information in an assemble‐to‐order system

[1]  David D. Yao,et al.  Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System , 2003, Oper. Res..

[2]  Yao Zhao,et al.  Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times , 2006, Oper. Res..

[3]  Yao Zhao,et al.  The Value of Component Commonality in a Dynamic Inventory System with Lead Times , 2009, Manuf. Serv. Oper. Manag..

[4]  Jing-Sheng Song,et al.  Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty , 2000, Manuf. Serv. Oper. Manag..

[5]  Kai Huang,et al.  Optimal FCFS allocation rules for periodic‐review assemble‐to‐order systems , 2015 .

[6]  Jing-Sheng Song,et al.  Optimal and asymptotically optimal policies for assemble-to-order n- and W-systems: Optimal and Asymptotically Optimal Policies , 2015 .

[7]  Qiong Wang,et al.  A Stochastic Programming Based Inventory Policy for Assemble-to-Order Systems with Application to the W Model , 2010, Oper. Res..

[8]  Susan H. Xu,et al.  Joint Inventory Replenishment and Component Allocation Optimization in an Assemble-to-Order System , 2004, Manag. Sci..

[9]  A. Zhang DEMAND FULFILLMENT RATES IN AN ASSEMBLETO‐ ORDER SYSTEM WITH MULTIPLE PRODUCTS AND DEPENDENT DEMANDS , 1997 .

[10]  Kai Huang,et al.  The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty , 2009, Oper. Res..

[11]  Jing-Sheng Song,et al.  Supply Chain Operations: Assemble-to-Order Systems , 2003, Supply Chain Management.

[12]  Vernon Ning Hsu,et al.  Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing , 2006, Manag. Sci..

[13]  Chengbin Chu,et al.  Supply management for cost minimization in assembly systems with random component yield times , 1997, J. Intell. Manuf..

[14]  David D. Yao,et al.  Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times , 2002, Oper. Res..

[15]  Bin Liu,et al.  Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes , 1999, Oper. Res..

[16]  Morris A. Cohen,et al.  Optimal material control in an assembly system with component commonality , 2001 .

[17]  Ivo J. B. F. Adan,et al.  Assemble-to-order systems: A review , 2017, Eur. J. Oper. Res..

[18]  Feng Cheng,et al.  Inventory-Service Optimization in Configure-to-Order Systems , 2002, Manuf. Serv. Oper. Manag..

[19]  Candace Aral Yano,et al.  Stochastic Leadtimes in Two-Level Assembly Systems , 1987 .