Integrating decisions with advance supply information in an assemble‐to‐order system
暂无分享,去创建一个
[1] David D. Yao,et al. Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System , 2003, Oper. Res..
[2] Yao Zhao,et al. Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times , 2006, Oper. Res..
[3] Yao Zhao,et al. The Value of Component Commonality in a Dynamic Inventory System with Lead Times , 2009, Manuf. Serv. Oper. Manag..
[4] Jing-Sheng Song,et al. Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty , 2000, Manuf. Serv. Oper. Manag..
[5] Kai Huang,et al. Optimal FCFS allocation rules for periodic‐review assemble‐to‐order systems , 2015 .
[6] Jing-Sheng Song,et al. Optimal and asymptotically optimal policies for assemble-to-order n- and W-systems: Optimal and Asymptotically Optimal Policies , 2015 .
[7] Qiong Wang,et al. A Stochastic Programming Based Inventory Policy for Assemble-to-Order Systems with Application to the W Model , 2010, Oper. Res..
[8] Susan H. Xu,et al. Joint Inventory Replenishment and Component Allocation Optimization in an Assemble-to-Order System , 2004, Manag. Sci..
[9] A. Zhang. DEMAND FULFILLMENT RATES IN AN ASSEMBLETO‐ ORDER SYSTEM WITH MULTIPLE PRODUCTS AND DEPENDENT DEMANDS , 1997 .
[10] Kai Huang,et al. The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty , 2009, Oper. Res..
[11] Jing-Sheng Song,et al. Supply Chain Operations: Assemble-to-Order Systems , 2003, Supply Chain Management.
[12] Vernon Ning Hsu,et al. Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing , 2006, Manag. Sci..
[13] Chengbin Chu,et al. Supply management for cost minimization in assembly systems with random component yield times , 1997, J. Intell. Manuf..
[14] David D. Yao,et al. Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times , 2002, Oper. Res..
[15] Bin Liu,et al. Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes , 1999, Oper. Res..
[16] Morris A. Cohen,et al. Optimal material control in an assembly system with component commonality , 2001 .
[17] Ivo J. B. F. Adan,et al. Assemble-to-order systems: A review , 2017, Eur. J. Oper. Res..
[18] Feng Cheng,et al. Inventory-Service Optimization in Configure-to-Order Systems , 2002, Manuf. Serv. Oper. Manag..
[19] Candace Aral Yano,et al. Stochastic Leadtimes in Two-Level Assembly Systems , 1987 .