Research issues for multi-level lot sizing in MRP systems

Abstract What lot size model(s) to use in a Material Requirements Planning (MRP) system is an unresolved and often debated issue. The concept of dependent demand, the complex network defined by the product structure, the dynamics of an operating MRP-based system, and the subsequent use of the planned order release schedule by other company subsystems represent a totally new environment for making and managing lot size decisions. The purpose of this paper is to identify and briefly examine ten research issues related to lot sizing in a dependent demand product structure. These ten issues expand the solution space for lot sizing in an MRP-based system compared to a reorder point based system. Areas for further research are suggested.

[1]  George Schussel Job-Shop Lot Release Sizes , 1968 .

[2]  David A. Collier,et al.  THE MEASUREMENT AND OPERATING BENEFITS OF COMPONENT PART COMMONALITY , 1981 .

[3]  D. Collier A comparison of MRP lot sizing methods considering capacity change costs , 1980 .

[4]  Russell L. Ackoff,et al.  An Approximate Measure of Value , 1954, Oper. Res..

[5]  H. Albert Napier,et al.  Optimal Multi-Level Lot Sizing for Requirements Planning Systems , 1980 .

[6]  E. S. Buffa Research in Operations Management , 1980 .

[7]  Joseph R. Biggs HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .

[8]  H. Taha,et al.  The Economic Lot Sizes in Multistage Production Systems , 1970 .

[9]  Gerald G. Brown,et al.  Seasonal Production and Sales Planning with Limited Shared Tooling at the Key Operation. , 1979 .

[10]  Bruce Jay McLaren,et al.  A study of multiple level lot sizing procedures for material requirements planning systems , 1977 .

[11]  Joseph D. Blackburn,et al.  HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .

[12]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[13]  Alan S. Manne,et al.  Programming of Economic Lot Sizes , 1958 .

[14]  Jack F. Williams Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons , 1981 .

[15]  D. Collier Aggregate Safety Stock Levels and Component Part Commonality , 1982 .

[16]  V. V. Raman Einstein a Centenary Volume , 1979 .

[17]  Leroy B. Schwarz,et al.  Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1975 .

[18]  Graham K. Rand,et al.  Decision Systems for Inventory Management and Production Planning , 1979 .

[19]  E. Newson Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources , 1975 .

[20]  P. M. Deane The First Industrial Revolution: The transport revolution , 1980 .