Research issues for multi-level lot sizing in MRP systems
暂无分享,去创建一个
[1] George Schussel. Job-Shop Lot Release Sizes , 1968 .
[2] David A. Collier,et al. THE MEASUREMENT AND OPERATING BENEFITS OF COMPONENT PART COMMONALITY , 1981 .
[3] D. Collier. A comparison of MRP lot sizing methods considering capacity change costs , 1980 .
[4] Russell L. Ackoff,et al. An Approximate Measure of Value , 1954, Oper. Res..
[5] H. Albert Napier,et al. Optimal Multi-Level Lot Sizing for Requirements Planning Systems , 1980 .
[6] E. S. Buffa. Research in Operations Management , 1980 .
[7] Joseph R. Biggs. HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .
[8] H. Taha,et al. The Economic Lot Sizes in Multistage Production Systems , 1970 .
[9] Gerald G. Brown,et al. Seasonal Production and Sales Planning with Limited Shared Tooling at the Key Operation. , 1979 .
[10] Bruce Jay McLaren,et al. A study of multiple level lot sizing procedures for material requirements planning systems , 1977 .
[11] Joseph D. Blackburn,et al. HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .
[12] D. Clay Whybark,et al. MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .
[13] Alan S. Manne,et al. Programming of Economic Lot Sizes , 1958 .
[14] Jack F. Williams. Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons , 1981 .
[15] D. Collier. Aggregate Safety Stock Levels and Component Part Commonality , 1982 .
[16] V. V. Raman. Einstein a Centenary Volume , 1979 .
[17] Leroy B. Schwarz,et al. Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1975 .
[18] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .
[19] E. Newson. Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources , 1975 .
[20] P. M. Deane. The First Industrial Revolution: The transport revolution , 1980 .